Laserfiche WebLink
• Visit the Mt Auburn crematory <br />• Policy problem in that Town earns money for services rendered. <br />Operationally, the process is stuck because the Town does not receive any <br />money due to the Perpetual Care Trust. <br />• How can Lexington use the Perpetual Care Trust? <br />Mr. Lucente reviewed the Selectmen's thought process in creating this ad hoc <br />committee, one that reaches beyond any financial implications. He reflected on the <br />how all Lexington residents need to have the option to have a peaceful death in <br />Lexington. This consideration involves more than convenience. It centers on the <br />desire for all residents to have a final resting place locally. Some residents wish to <br />have the option to die in Lexington. <br />Mr. McGaw arrived at 8:30pm. <br />Further discussion points included: <br />• There appears to be a misunderstanding that Lexington would run the <br />potential crematorium as a business. <br />• Market conditions include that the bulk of crematory work in conjunction <br />with a funeral home and hospital-based crematorium needs are handled at <br />Boston sites <br />• The price to be cremated would not be cheaper in Lexington <br />Discussion of 2019 Annual Town Meeting Articles <br />1. Article 6 Crematorium Facility at Westview Cemetery - A citizen's article <br />2. Article 20G Westview Cemetery Facility Construction - sponsored by the Town <br />Upcoming meetings pertinent to this committee's discussion include: <br />• February 22 - Board of Selectmen who need to know the preliminary <br />standing of the Committee on the Westview Cemetery <br />• February 28 - Permanent Building Committee where the Westview plans <br />will be reviewed. There is limited funds available from 2017 Annual Town <br />Meeting's $270,000 appropriation. These funds cannot be used to design a <br />crematory. To do so, there would be the need to return to Town Meeting for <br />additional design funding. <br />The Committee discussion included: <br />• The geography of the Westview property is a concern <br />• The Town should not compromise the maintenance building <br />• There were reservations about the current plans and future FTE <br />requirements. These included constructing a design -ready building as more <br />efficient. It might only need a retort and hearse bay in its addition. <br />