Laserfiche WebLink
Greenways Corridor Committee <br /> January 17, 2019 <br /> Ellen Stone Room, Cary Hall <br /> Lexington, Massachusetts <br /> Members Present: Alex Dohan, Peggy Enders, Eileen Entin, Bob Hausslein, Susan Kenyon, <br /> Keith Ohmart, Mike Tabaczynski <br /> Other Attendees: none <br /> Votes: Minutes of December 20, 2018, meeting: Approved <br /> Reports/Updates: <br /> • Route K - Keith has drafted a letter to the abutters of Parcel A on Peacock Farm Rd (# 41 <br /> and #43) and that is with Carol Kowalski. The small beech tree that is somewhat in the trail <br /> will not be removed - it is on Town land and would require a Notice and a Hearing to do so. <br /> Don and Keith have a spreadsheet for the route markings and will be ready to install in the <br /> spring. <br /> • Bridge School trail NOI - Jordan McCarron is reviewing the submission and will follow up. He <br /> has an Eagle Scout interested in the project. <br /> • Fairland St project - Susan communicated with Mark Barons. He is working on ADA require- <br /> ments, and reports that some neighbors do not want a trail as he has proposed it. <br /> Current Business: <br /> • Proposed work for 2019 - Discussed several possible options for future Routes. <br /> • Juniper Hill is out of the way, but could possibly be connected with landowner permission. <br /> Peggy will reach out to Robert Rotberg on Barberry Rd. There is other private property that <br /> we would need permission to use also for that route. <br /> • Another upcoming option (ID#3) is a Connector route between Daisy Wilson Meadow and <br /> Dunback Meadow. This could also connect Route B and Route C making a big loop, includ- <br /> ing Rockville Ave and Summit Rd. Will need to work with principal at Bowman School - do <br /> we need a policy for crossing school property during school hours? We do need to notify <br /> abutters when signs are going up. <br /> • There is a pond off Solomon Pierce Rd (ID#13) that would be a nice stop on a Connector be- <br /> tween Arlington Great Meadow and Lower Vine Brook. Permission will be needed from the <br /> Town of Arlington. It could be possible to connect through behind the Harrington School and <br /> a Town parcel off Woburn St. This could connect Route C and Route G at Lower Vine Brook. <br /> This is more likely to be in the 5-year plan, and should be walked with Karen Mullins and <br /> Conservation Commission. <br /> New Business: <br /> none at this time <br />