|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-09-17-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2018
>
2018-09-17-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:22 PM
Creation date
1/16/2019 8:50:19 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
growing season.Restoration activities include installation of erosion controls and hydro- <br /> seeding with appropriate native conservation seed mix.Mr.Hale told the Commission that <br /> the next step of the project will be hydro directional drilling under Hobbs Brook.There <br /> will be a digging of pits in the Riverfront area in order to minimize the length of conduit <br /> laid under Hobbs Brook. <br /> Mr.Hamilton raised his concern regarding the construction impact to the vernal pools in <br /> the area and the need to immediately remove erosion controls that were placed in the pool. <br /> Ms.Buttarro exclaimed that they had been waiting to begin restoration activities around <br /> the vernal pool until official permission and approval was given by the Commission. <br /> Mr.Hale described that continued restoration projects will include cleaning up disturbed <br /> and exposed soil areas to minimize impact.These activities will continue after the <br /> installation of the conduit. <br /> Mr.Bitsko raised his concern about the stabilization of the proposed seed mix and <br /> whether it will germinate in time.Mr.Hale responded that VHB will be monitoring the <br /> site on a weekly basis and that additional seed including an annual rye grass can be <br /> applied if conservation seed germination is minimal this fall.Further,Monitoring of the <br /> HDD will be conducted on a daily basis by VHB. Mr.Bitsko confirmed that further site <br /> visits will be completed by Ms.Mullins to also verify stabilization and restoration <br /> compliance. <br /> Mr.Hamilton made it clear to the audience that many site visits and coordination by the <br /> Commission and the Administrator has been done to get this enforcement matter resolved <br /> and an after the fact approval for the electrical conduit duct bank install by the <br /> Commission in apparent short time for the main goal of wetlands protection in order to <br /> restore the already disturbed wetlands and buffer areas and stabilize disturbed areas as <br /> soon as possible this fall. <br /> On a motion by Mr.Wolk and seconded by Ms.Dohan,the Commission voted 4-0 <br /> moving to close the hearing. <br /> On a motion by Mr.Bitsko and seconded by Ms.Dohan,the Commission voted 4-0 to <br /> issue the order of conditions approving with standard erosion control and restoration of <br /> wetlands and buffer zone conditions for the after the fact electrical conduit duct bank <br /> project and the additional HDD installation through the Hobbs Brook Riverfront Area and <br /> the necessary and required after the fact significant restoration and on-going monitoring <br /> activities to stabilize and enhance the disturbed wetlands and buffer zone areas resulting <br /> from the project. <br /> Continued Public Hearings <br /> 7:35 pm <br />
The URL can be used to link to this page
Your browser does not support the video tag.