Laserfiche WebLink
growing season.Restoration activities include installation of erosion controls and hydro- <br /> seeding with appropriate native conservation seed mix.Mr.Hale told the Commission that <br /> the next step of the project will be hydro directional drilling under Hobbs Brook.There <br /> will be a digging of pits in the Riverfront area in order to minimize the length of conduit <br /> laid under Hobbs Brook. <br /> Mr.Hamilton raised his concern regarding the construction impact to the vernal pools in <br /> the area and the need to immediately remove erosion controls that were placed in the pool. <br /> Ms.Buttarro exclaimed that they had been waiting to begin restoration activities around <br /> the vernal pool until official permission and approval was given by the Commission. <br /> Mr.Hale described that continued restoration projects will include cleaning up disturbed <br /> and exposed soil areas to minimize impact.These activities will continue after the <br /> installation of the conduit. <br /> Mr.Bitsko raised his concern about the stabilization of the proposed seed mix and <br /> whether it will germinate in time.Mr.Hale responded that VHB will be monitoring the <br /> site on a weekly basis and that additional seed including an annual rye grass can be <br /> applied if conservation seed germination is minimal this fall.Further,Monitoring of the <br /> HDD will be conducted on a daily basis by VHB. Mr.Bitsko confirmed that further site <br /> visits will be completed by Ms.Mullins to also verify stabilization and restoration <br /> compliance. <br /> Mr.Hamilton made it clear to the audience that many site visits and coordination by the <br /> Commission and the Administrator has been done to get this enforcement matter resolved <br /> and an after the fact approval for the electrical conduit duct bank install by the <br /> Commission in apparent short time for the main goal of wetlands protection in order to <br /> restore the already disturbed wetlands and buffer areas and stabilize disturbed areas as <br /> soon as possible this fall. <br /> On a motion by Mr.Wolk and seconded by Ms.Dohan,the Commission voted 4-0 <br /> moving to close the hearing. <br /> On a motion by Mr.Bitsko and seconded by Ms.Dohan,the Commission voted 4-0 to <br /> issue the order of conditions approving with standard erosion control and restoration of <br /> wetlands and buffer zone conditions for the after the fact electrical conduit duct bank <br /> project and the additional HDD installation through the Hobbs Brook Riverfront Area and <br /> the necessary and required after the fact significant restoration and on-going monitoring <br /> activities to stabilize and enhance the disturbed wetlands and buffer zone areas resulting <br /> from the project. <br /> Continued Public Hearings <br /> 7:35 pm <br />