Laserfiche WebLink
LEXINGTON TREE COMMITTEE MEETING MINUTES <br /> Thursday, September 13, 2018 at 7:30 am <br /> Room 125, Samuel Hadley DPW Building, 201 Bedford Street <br /> Present: Members Gerry Paul (Chair),Jewel Kuljan, Jim Wood,Anne Senning, Nancy <br /> Sofen,John Frey (Emeritus), Jill Hai (Selectman liaison), Bob Creech (Planning <br /> Liaison). Guests Erik Gitschier (DPW), Gang Chen, Gloria Bloom, Kathleen Lenihan. <br /> Absent: Chris Filadoro (Tree Warden), Pat Moyer (member) <br /> 1. Nancy Sofen was appointed scribe. Minutes of the August 9, 2018 meeting <br /> were approved. <br /> 2. Erik Gitschier outlined sidewalk work that is being planned by the Highway <br /> Department this fall (Appendix A), and described his approach to sidewalk <br /> replacement. <br /> a. A study was done 3-4 years ago to see which sidewalks need work. <br /> Priorities for which sidewalks will be replaced are determined by Safe <br /> Routes to Schools, amount of use, condition and other factors. <br /> b. Sidewalks must be 5' wide (by selectmen's mandate) to accommodate <br /> 4' wide snow equipment and the fact that equipment is operated in <br /> less than ideal conditions (snow cover and operator fatigue). <br /> c. They try when possible to leave a 3' or larger planting strip, and to <br /> replant more trees than are removed. <br /> d. While Tree Committee prefers meandering sidewalks, snow removal <br /> and ADA requirements for clear line of sight make that difficult. <br /> e. P.J.Albert (the contractor currently working on Mass. Ave. project) has <br /> been chosen for sidewalk replacements listed,with Mass.Ave. and Oak <br /> Street to be the first to be done. EG is confident that they know the <br /> town's expectations regarding tree protection. He expects that no <br /> trees will be removed for these sidewalks. <br /> f. Would like to walk Emerson Gardens Road with Tree Committee <br /> members, to see how best to replace this sidewalk that has been <br /> damaged by maple roots. ACTION ITEM: members to email <br /> availability over the next few weeks. Anne comments that many <br /> setback trees were planted in the ROW because underground Comcast <br /> lines prevented the planting of street trees. <br /> 3. Submission to Town Annual Report (Appendix B) was approved as amended: <br /> a. Reference to web site maintenance was removed. <br /> b. The seventh bulleted highlight was reworded to read, "Provided input <br /> to the Tree Warden for information to be collected for a complete <br /> Town tree inventory to be conducted in FY19." <br /> 4. Applicants for the open position on the committee introduced themselves. <br />