|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1963-07-08
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1960-1969
>
1963
>
1963-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:42:08 PM
Creation date
7/31/2018 3:17:39 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING BOARD MEETING <br />' July 8, 1963 <br />A regular meeting of the Lexington Planning Board was held <br />in its office, Town Office Building, on Monday, July 8, 1963, at <br />8:00 p.m. Present were Chairman Mabee, members Bryson, Greeley <br />and Meyer, and Mr. Snow consultant. <br />Mr. Donald M. Graham, Director, and Mr. Michael Greenbaum, BOSTON <br />Chief of Transportation, of the Boston Regional Planning Project REGIONAL <br />met with the Board from 8:00 to 9:00 p.m. to discuss the project PLANNING <br />and to answer any questions the Board might have in regard to it. PROJECT <br />Mr. Graham said the project was organized around the 152 <br />cities and towns within the circle created by the proposed loca- <br />tion of Interstate Route 495• He said funds for the project were <br />being equally shared by the State Department of Public Works and <br />the Mass Transportation Committee created by the State legisla- <br />ture. He also said that the project had two main objectives: the <br />preparation of a preliminary comprehensive plan and the initiation <br />of a continuing planning process at the state level. <br />Mr. Graham pointed outthatthe project had two.serious <br />' weaknesses: the first being the policy committee of five members <br />established by common consent and on which no local officials <br />were represented; and second being that the State was not really <br />committed to the project. <br />Mr. Graham told in detail of the studies the project was <br />undertaking, these consisting of gathering information, analyzing <br />and forecasting, and of planning operation. He said that at the <br />conclusion of these studies the project proposed to prepare a pre- <br />liminary composite statement of policy of a regional plan. He <br />stated that this sdatement would be a communications device,.em- <br />phasizing highways and transportation. <br />Members of the Board asked Mr. Graham if the basic informa- <br />tion assembled during the project would be available to use. He <br />said it would be available to all. <br />Mr. Graham was also asked in what way planning boards might <br />be of assistance in the project other than by cooperating in sup- <br />plying what basic information they had. He said that localities <br />could insist upon saving the project by bringing effective local <br />pressure to bear on state agencies which would rather not be <br />bothered with the project in the first place. <br />From 9:00 to 9:40 p.m. the Board met in the Town Account- <br />ant's office with representatives of the Appropriations and Cap- LONG RANGE <br />ital Expenditures committees to discuss ways and means of pre- FINANCIAL PLAN <br />paring a long-range financial plan for Lexington by a citizen's <br />
The URL can be used to link to this page
Your browser does not support the video tag.