Laserfiche WebLink
In regard to the petition of Dr. Ralph W. Galen <br />to be heard on May 7, 1957, the Board approved a draft of ' <br />a letter to the Board of Appeals in which the Planning <br />Board wished to be placed on record as being opposed to <br />the granting of said petition. (See addendum). <br />OAK HILL Next taken under consideration was the application <br />ESTATES for tentative approval of the preliminary plan for the <br />Oak Hill Estates submitted by Sandy Brook Corp., 99 Old <br />Billerica Road, Bedford, Mass. It was moved, seconded, <br />and unanimously <br />VOTED: that tentative approval be given of the plan <br />dated March 20, 1957 and entitled "'Prelimi- <br />nary Plan' Oak Hill Estates Plan of Land in <br />Lexington, Mass. owned by Sandy Brook Corp.", <br />subject to the following conditions: (1) that <br />"A" and "CTM streets be 50t in width their <br />entire length; (2) that the maximum elevation <br />on "C" street be of equal width throughout <br />its length and intersect "A" street at right <br />angles. <br />ROBINSON <br />The Board then endorsed the definitive subdivision <br />HILL <br />plan of Robinson Hill, Section 3, approved by the Board <br />SEC. 3 <br />on April 10, 1957. <br />LORING <br />Mr. Stevens came to the meeting at 9:35 p.m. at which ' <br />HILL <br />time the Board took under consideration Mrs. Baskin's <br />ESTATES <br />application for approval of the Loring Hill Estates Sec- <br />tion 1 definitive subdivision plan. The Board read and <br />discussed with Mr. Stevens the September 22, 1947 agree- <br />ment between the Town and the trustees of the Lexington <br />Estates Trust concerning the provision that the town con- <br />struct a Board of Survey road connecting Waltham Street <br />to a road meeting the former trustees' (now Baskin) land <br />when a road is constructed on said land for subdivision <br />purposes. It was the opinion of the Board that the road <br />from Waltham Street leading into the High School grounds <br />should not be used as an access to the Baskin property <br />and that a work road should be constructed from Waltham <br />St. to the proposed road in said subdivision over the <br />proposed location of the Worthen Road project. <br />Meeting with the Selectmen later in the evening, it <br />was decided that before the Planning Board approved the <br />subdivision plan the Selectmen should determine what access <br />over town land the subdivider had to the proposed Loring <br />Hill Estates subdivision. <br />RECREATION <br />Mr. Stevens left the meeting at 9:50 p.m. at which time <br />COMMITTEE <br />' <br />Chairman Crerie of the Recreation Committee and. Members <br />Delsie, McNally and Stokes, and Recreational Director <br />Samborski met with the Planning Board to discuss further <br />