Laserfiche WebLink
PLANNING BOARD MEETIM <br />Monday, January 31, 1955 <br />' <br />Grindle, Snow, Stevens <br />Present: Adams, Hathaway, Irwin, Jaquith, Ripley - <br />Meeting opened at 7:50 o'clock. The record of the previous meeting <br />was read and approved. <br />Board of Selectmen <br />, <br />Mr. Haskell Reed, reporting for the Board of Selectmen, stated that <br />the Board felt it would be better to hold from the forthcoming Town Meet- <br />ing the articles on the municipal parking area betw®en-Waltham and P.wzey <br />streets, and the new road from Bedford St. to Hastings Park. The Selectmen <br />felt that they needed more time for hearings and in which to properly pre- <br />pare presentation data. Mr. Reed further stated there probably would be a <br />Special Town Meeting scheduled in May at which time the Selectmen.felt <br />the information relative to these articles would be in proper form. <br />Busa <br />A public hearing was held at 8 o'clock relative to an application <br />by Antonio Busa to approve a subdivision plan whereby a lot having an area <br />of about 61,633 sq. ft. is created at a distance approximately 350 ft. <br />from Lowell St. and an easement established from Lowell St. to said lot. <br />The Boston Edison Co. proposes to build a distribution substation on the <br />lot. Mr. Joseph B. Pellegrino,- District Manager of Boston Edison Co, <br />represented the petitioner, and seven other citizens were present. Mr. <br />Pellegrino explained that the Mixes which would provide power to the sub- <br />station would be installed underground to the station from Lowell St, and <br />then out again on poles, using the regular system on Lowell St. Construc- <br />tion would consist of a bank of switches and one or two transformers set <br />on piers on a concrete foundation, this entire installation being enclosed <br />with a 10 ft. wire fence. When asked if all the wires could be run under- <br />ground., Mr. Pellegrino replied that although it could be done it was not <br />desirable to do so from the Edison standpoint. It was pointed out there <br />were already poles along the easement. Mr. Pickering of 9 Summer St. <br />asked what, if any, effect there would be upon television reception and Nr. <br />Pellegrino assured him that there would be no ill effects, that the picture <br />would be clearer if arUthing because there would be a greater and more even <br />flow of power. He stated it was improperly operated motors which created <br />trouble and that no motors were involved here. At a later date project <br />plans will be submitted to the town engineer for approval, including loca- <br />tion of underground installation. It is proposed to add more transformers <br />as the need arises with the growth of population. A letter was read from <br />the M. D. C. stating that they had no objection to the proposed Use pro- <br />vided the substation plan was amended by adding tie-in data locating the <br />M. D. C. sewer easement in the northwest -corner of the proposed company lot. <br />The Edison Company has already complied with this request. <br />Those wishing to be recorded in favor were Daniel and Alfred Busa, <br />Mrs. Vivien Reed and Mr. Haskell W. Reed. There were none opposed. <br />Bills <br />Louise M. Baker, secretarial service Jan. 3, 10, 17, 24 and 31 0 $5, <br />