Laserfiche WebLink
14 fr. 0 P q A if W-TITa 1 ,:}CM:4 11 <br />Tuesday., March 18,1952 <br />Present: Adams, Hatba Irwin Johnson and Town Engineer Burns <br />may, > > � . <br />The meeting opened at 7s145 o'clock. <br />Mr. Caouette appeared with s%Uestion that the Planning Board sponsor <br />at the Town Meeting under Article 2 a recommendation by which the Moderator <br />would appoint a committee of 15, three of which should be realtora, to act <br />as a study group in connection with the new laboratories in Lexington, to <br />determine the housing needs and to lend every possible assistance in work- <br />ing out ways and means to adequately house this personnel. This would be <br />with the idea of trying to avoid the government stepping in with government <br />housing. <br />The Board after discussion felt it would be better to have an estab- <br />lished group of real estate men set up a committee to work with the Planning <br />Board, under whose direction this normally comes, rather than to have two <br />town committees working on the same problem. <br />Mmant Associgt&s <br />Mr. Small of Arlington appeared for tentative approval of portion of <br />subdivision of Pleasant Associates, which included Whipple, Wheeler, Douglas, <br />and Cranston roads. Moved by Mr. Irwin and seconded by Mr. Hathaway that <br />tentative approval be given subject to approval by Mr. Burns. Date for pub- <br />lic hearing set for Monday, March 31. <br />Bite & Shelter - Hear nu <br />At advertised hearing, Mr. Louis MacMillan, 96 Mt. Auburn St., Cam.. <br />bridge, appeared for Site & Shelter for tentative approval of extension of <br />Barberry Road in Five Fields development. No objectors appearing, Mr. John- <br />son moved, Mr. Irwin seconded, tentative approval be given subject to <br />approval of Mr. Burns. <br />Ee]].y Construction <br />Mr. Joyce appeared for Kelley Construction Co. for preliminary approval <br />of subdivision of Aftmroe Estates between Lowell and Woburn streets. Later, <br />upon discussion with Town Engineer Burns, the Board was advised that no <br />approval could be given to the present plan without showing proposed scheme <br />of drainage. <br />I -%r.n,,. <br />A letter was read from Board of Selectmen requesting a date for a meet- <br />ing with the Planning Board to discuss Fdison Way. Date not for Monday, <br />April 14, <br />