|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1932-03-15
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1930-1939
>
1932
>
1932-03-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:07:39 PM
Creation date
7/31/2018 3:16:05 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />ir <br />PLANNING BOARL MEETING <br />March 15, 1932 <br />A meeting of the Planning Board was held in the Con- <br />ference Boor: of the Town Office Building, Parch 15, 1932 at <br />8:00 P. M. i'-•essrs. Emery, Scheibe, Milne and Glynn were <br />present. Roland Greeley, the Town Engineer and the secretary <br />were also present. <br />The Board organized, reelecting fir. Emery as Chair- Organization <br />man and Mr. Scheibe as Clerk. <br />The Town Engineer stated that he had nothing to re- <br />port on the Vine Brook Project as he had been unable to <br />crake soundings due to heavy frost in the ground. This is <br />the first step to be taken in laying out the lines and if <br />done now it Nr,ould cost a lot more than later on when the <br />ground thaws. He inforried the Board that he would start <br />this viork as soon as possible. <br />In the meantime, Lr. Cosgrove is going to work on <br />the development of new streets for the trunk line sewer <br />between Lowell Street and Grant Street and has already <br />starteN a 100 ft. scale plan of the area. The Board <br />suggested that while making a study of the development of <br />this area between Lowell and Maple Streets including Great <br />Meadows, he consider a school house and recreation areas. <br />It would take six weeks to get topography from Arlington <br />line to �,aple Street which is necessary before the streets <br />can be laid out. It was suggested that this layout be con- <br />tinued to North Hancock Street. <br />Vine Brook <br />Project <br />Topo. survey <br />to make devel• <br />opment study <br />of area from <br />Arl. line to <br />Maple St. ex- <br />tending from <br />Lowell St. to <br />B.&M. R. he <br />
The URL can be used to link to this page
Your browser does not support the video tag.