|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1928-09-13
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1920-1929
>
1928
>
1928-09-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:07:34 PM
Creation date
7/31/2018 3:16:01 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PLANNING BOARD MEETING <br />Lexington, Mass. <br />September 13, 1928, <br />Present. Messrs, Emery, Cutler, Duffy, Glynn and <br />Milne. <br />The engineer's report regarding the Vine <br />Brook drainage project was reviewed and the ad. <br />visability of providing a Planning Board preamble <br />for it was discussed. <br />There was discussion of the doubtful <br />possibility of an open channel design shown being <br />possible between Vine Brook Road and Mass. Avenue, <br />and it was suggested that this matter be reviewed <br />further with the engineers. <br />Mr. Emery felt that a further meeting with <br />the engineers would be desirable and suggested certain <br />arrangements. It later developed that it would be <br />advisable if further meeting of the Planning Board be <br />held on Monday September 17 at eight o'clock, at which <br />the engineers' Mr. Raymond would be present. <br />W. D. Milne, <br />Clerk. <br />Mr. Emery reported his further discussion <br />of the project with Mr. Ryder, and indicated his <br />feeling that it would be necessary for a development <br />company to be formed by the Ryder interest in order <br />that co-operation might guarantee to the town the <br />betterments payments if the town undertook a work <br />' <br />of such magnitude. <br />It was felt that a report should more <br />clearly develop the extent of the benefit of the <br />drainage work beyond the immediate area reclaimed <br />and available for building developments which the <br />report indicated to be 185 acres. <br />There was discussion of the doubtful <br />possibility of an open channel design shown being <br />possible between Vine Brook Road and Mass. Avenue, <br />and it was suggested that this matter be reviewed <br />further with the engineers. <br />Mr. Emery felt that a further meeting with <br />the engineers would be desirable and suggested certain <br />arrangements. It later developed that it would be <br />advisable if further meeting of the Planning Board be <br />held on Monday September 17 at eight o'clock, at which <br />the engineers' Mr. Raymond would be present. <br />W. D. Milne, <br />Clerk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.