|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1927-05-03
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1920-1929
>
1927
>
1927-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:07:32 PM
Creation date
7/31/2018 3:16:00 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLI.NNING Bohan VEETING* <br />Lexington, Mass, <br />May 30 1927, <br />Present; Full Board and Mr, Raymond for Metcalf and Eddy. <br />This was a joint meeting with the Selectmen <br />at rzhich the whole Vine Brook Drainage and Park de- <br />velopment project was explained and discussed. Mr. <br />Ballard asked for a report from the engineer outlying <br />the project and the pbysical features, limiting the <br />design as developed by the engineer's study and survey. <br />This was promised, <br />Meeting adjourned at 11 P.M. <br />. U. Innes <br />Clarkâ <br />
The URL can be used to link to this page
Your browser does not support the video tag.