|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-04-26-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2010-2019
>
2018
>
2018-04-26-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:24:50 PM
Creation date
5/18/2018 11:57:57 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PLANNING BOARD MINUTES <br />MEETING OF APRIL 26, 2018 <br /> <br />A meeting of the Lexington Planning Board, held in the Hudson Room, in the Cary Memorial <br />Building was called to order at 7:02 p.m. by Chair, Richard Canale with members Ginna Johnson, <br />Charles Hornig, Nancy Corcoran-Ronchetti, Bob Creech, and Michael Leon, and planning staff <br />Aaron Henry, David Fields, and Lori Kaufman present. <br />*********************DEVELOPMENT ADMINISTRATION************************ <br />7 Hartwell Avenue, Sketch PSDUP: <br />The applicant has requested a continuance of this matter to May 10, without discussion. <br />The Board agreed to continue the meeting without discussion continued to May 10, 2018. <br />5 Winding Road, ANR: <br />This ANR seeks to divide the lot at 5 Winding Road into a slightly smaller buildable lot and an <br />unbuildable parcel that is to be conveyed to the Lexington Golf Club. <br />On a motion of Mr. Hornig, seconded by Ms. Johnson, it was voted, 5-0, and authorize the <br />Planning Director to endorse the ANR on the Board’s behalf as it does not show a subdivision. <br />Solly’s Way, Close-Out Project: <br />Solly’s Way was completed a number of years ago with the issue to underground the electrical <br />service and needed to wait for a local street moratorium that prohibited work at that time. Once <br />the moratorium ended, Verizon the owner of the pole raised an objection prohibiting the <br />undergrounding under any scenario because there was no room left on the pole in the area. <br /> <br />On a motion of Ms. Johnson, seconded by Ms. Corcoran-Ronchetti, it was voted, 5-0, that the <br />work associated with public infrastructure for the subdivision known as Solly’s Way’s is <br />complete, and authorize the Planning Director to endorse any forms associated with project <br />completion on the Board’s behalf. Staff will first look to see if the decision needs to be amended. <br />PUBLIC HEARING <br />443 Lincoln Street, Balanced Housing Development (BHD): <br />Ms. Johnson recused herself from this special permit and Mr. Leon, Associate Planning Board <br />Member will sit in her place for this special permit. <br />Present at the meeting were Jeff Rhuda, applicant, James Emmanuel, landscape architect, Brad <br />Latham, attorney, and Rich Harrrington, engineer. Mr. Rhuda addressed the Planning Board’s <br />questions from the last meeting. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.