Laserfiche WebLink
1 <br />SELECTMEN'S MEETING <br />January 6, 1975 <br />A regular meeting of the Board of Selectmen was held in the <br />Selectmen's Meeting Room, Town Office Building, on Monday evening, <br />January 6, 1976, at 7:30 p.m. Chairman Kenney, Messrs. Bailey, Buse, <br />and Mrs. Battin; Mr. O'Connell, Town Manager; Mr. Cohen, Town <br />Counsel; Mr. McSweeney, Director of Public Works/Engineering; Mrs. <br />MCCurdy, Executive Clerk, Were present. <br />At the request of the Town Clerk, the following jurors weae <br />drawn: <br />Dora A. Carr 455 Lowell Street <br />Bernard R. Danti 74 Bloomfield Street <br />Mr. O'Connell informed the Board that the Minute Man Regional <br />Vocational School is scheduled to be opened on January 13, 1975, and <br />as a result of a letter from our Building Commissioner, he had <br />alerted the School Superintendent that all necessary permits must <br />be obtained in order to have a Certificate of Occupancy issued. <br />Mr. O'Connell recommended the approval of the Board of a reserve <br />transfer of $1100 to Account 2930 -Office Machine Repairs, due to a <br />mechanical failure during the water billing period. If these repairs <br />are made, it will mean several more years of use for this machine; <br />a new machine would cost approximately $5-6,000. <br />Upon motion duly made and seconded, it was voted to request <br />approval of the Appropriation Committee of a transfer from the <br />Reserve Fund to Account 2930 in the amount of $1100. <br />177 <br />Jurors <br />Transfer - <br />Acct. <br />2930 <br />Mr. O'Connell discussed the Center swimming pool recreation Center <br />area. This pool is about 40 years old and, last year, Mr. Bertini Pool <br />had expressed his concern about a possible breakdown. In our review, Area <br />we pinpointed two different problems - the old water filter on the <br />main pool and an inadequate number of boy's toilet facilities. We <br />first determined it would be $20,000 to redesign and modernize the. <br />pool but, out of related capital budget planning, the decision <br />was made to make $10,000 available to study the recreation need, <br />and assigned it to the Planning Board for study. We included in that <br />plan a trailer with toilet facilities. Since that time, as a result <br />of more information and estimates of cost of installing khat system <br />Mr. McSweeney determined that the program, if it followed the State <br />standards, would represent an additional $35,000. We do not be- <br />lieve that the condition of the pool and the question of the future <br />can in any way justify going this far on a maintenance type program. <br />We suggest that the Board call for a meeting with the Planning <br />Board and the Recreation Committee to re-examine what the best short- <br />range course of action would be. Can we get by if the addition of a <br />filter is going to cost $40,000? It is no longer a get -by maintenance <br />but a major renovation. <br />