Laserfiche WebLink
it <br />working at shop painting equipment and piling'stock; worked one day <br />on cement floor; raised hydrant at Parker School; raised hydrant <br />at end of Bertwell Road; regular maintenance work. <br />ENGINEERING DEPARTMENT <br />Highways <br />Supplied lotting information to State Valuation Engineer <br />along new layout of Summer Street, Lowell Street, East Street, <br />to Grove Street, to Bedford Street. <br />Sewers <br />Woburn Street survey of Drury lot to check abate- <br />ment or return claim. <br />s Continued work on Town Sewer Study. <br />Miscellaneous <br />1 <br />1 <br />Completed plan and wrote description of additional land <br />at Parker School. <br />Started numerical index system (Book or record) of <br />plans on hand to check all Lexin^ton plans at Registry of <br />Deeds. <br />Work on street numbering plans. <br />Remarks <br />The final work is now being done on the Town Sewer <br />Plan. This is mostly field. work and I expect to turn the <br />information over to Metcalf & Eddy before April 15th. <br />Yours very truly, <br />William S. Scamman <br />Supt. of Public Works <br />The.Board signed an order establishing tho relocation <br />of Massachusetts Avenue in front of the property of Daniel <br />J. al Connell from, the', northerly terminus of the present <br />street line on the former To,:°m Hill property now owned by <br />Messrs. Rubin and Serio an to tho rroIDerty of Anstiss S. <br />Hunt, et al. <br />The Board signed .n order establishin` the lay out as <br />a Town way of Dexter Road from Fuller Road to "''Iillisms <br />Road. <br />The meeting adjourned at 10 P.T:. <br />A true record, Attest: <br />Clerk. <br />445 <br />