|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1930-08-12
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Minutes
>
1930-1939
>
1930
>
1930-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 2:08:50 PM
Creation date
1/18/2018 2:08:46 PM
Metadata
Fields
Template:
Archives
Department
Selectmen
Keywords or Subject
BOS, Selectmen Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Moth & Shade Tree Department. <br />' Trees trimmed on the Hancock School grounds, <br />and on Forest Strett and Clarke Street. <br />Next week the Department will cut brush and <br />trim trees. <br />Park Dept. <br />Work of grading and seeding Hastings Park and <br />construction work on a• new tennis court as well as <br />regular maintenance. <br />Next week work on a new tennis court and regular <br />maintenance will be cared for:. <br />Water & Sewer Department <br />Water Maintenance <br />Water service installed for Irwin, Cliffe Ave; <br />water service for Barker changed from Simonds Road to <br />Burlington Street. <br />Water . Cons t ruc tion. <br />Raising manhole covers on Concord Hill where new <br />road 'is being constructed. <br />' The 16" main in Mass. Avenue has been completed <br />with the exception of the connections st Child's garage <br />and at Bowker Street. It is expected that this work <br />will be done on or before Thursday, August 14th. <br />Sewer Construction. <br />Unloaded carload of 8" sewer pipe. <br />Work was started August 8th on the extension of <br />the 8" sewer main in Fottler Avenue and approximately <br />130' of pipe have been laid. <br />Next week the Fottler Avenue sewer; water and <br />sewer services, etc. <br />Engineering 'Department <br />Highways. <br />Reset Woburn Street stone bound. <br />Tied in Bertwell Road stone bounds to reset. <br />We have set line and grade stakes for Bertwell Rd. <br />Line for Lowell St. property owner. <br />Set 5 stone bounds at Clarke St. extension. <br />' Set grades <br />Appointment <br />sewer study. <br />Sewers. <br />for Fottler Avenue sewer. <br />with Mr. Rgymond regarding Town <br />257 <br />
The URL can be used to link to this page
Your browser does not support the video tag.