|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1929-01-12
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Minutes
>
1920-1929
>
1929
>
1929-01-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2018 6:53:10 PM
Creation date
1/10/2018 3:59:17 PM
Metadata
Fields
Template:
Archives
Department
Selectmen
Keywords or Subject
BOS, Selectmen Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />SIE ':MEEKLY REPORT OF THE SUPT. OF PUBLIC "JORKS <br />For week ending January 12,1929. <br />Highway Dept. <br />Gravel spread and graded on Reed Street; <br />Ward Stre-t Wi-ter Street, T°restview Street, <br />Old County Aosd. Trees and busies out on <br />a number of bad corners on Grove Stret. <br />It is intended to cut back these corners <br />as the present condition is d.angerol.is con- <br />sidering the amount of traffic on this street. <br />The work of placing a granite edgestone <br />in front of the hydrants on Massachusetts <br />Avenue, between LexingtonCenter and the <br />Arlington line has been completed and. this will <br />protect them to a great extent from being bro'xen <br />by collision. <br />Sand. covering wa.s spread on several streets <br />to prevent the bituminous from breaking up. <br />Surface patches were made on Massachusetts Avenue. <br />Street signs were erected at Carville Ave., <br />corn^r of Oak Street, Chase Ave., corner of <br />Taft Avenue, Bennett Avenue, corner Chase <br />Avenue, Blossom Street, corner,'Naltham Street, <br />and hayes Avenue, corner of lderiam Street.. <br />Snnw fell `,fllursdav -?nl Sat:zrdav, January 10th <br />and 12th. Sidewalks and street plows were <br />emnlo:Ted on both days to clear away the snow. <br />Moth Department. <br />Gyrsy moth pests treated With creosote on <br />trees in Walnut Street, Pleasant Street and <br />last Street. <br />Park Department. <br />Regular maintenance work carried on. <br />dater Maintenance. <br />About 150 feet of 12" ripe have. been laid in <br />i�assachusetts Avenue. The work contemplated for <br />the week ending January 26th is as follows: <br />continuation -)f the laying of the 12" water main; <br />regular water maintenance work. ' <br />Engir_eering Denartment, <br />J'J'ate.r <br />Line for 12" main in M-ssacrusetts Avenue between <br />Bedford ct., and ""'alt'nam St. <br />
The URL can be used to link to this page
Your browser does not support the video tag.