Laserfiche WebLink
471 <br />'fleeting, July 27, 1926. <br />' A regular meeting o" the Board of Selectmen was �,eld at the <br />Selectmen s Office at 7:30 P._`. `des=rs. Custance, Burnham, Files, <br />Robertson and Ballard were present. The Superintendent of Public <br />Works and the Clerk e.ere ,%l3o prcwe--t. <br />In accordance with request for bids on $19,000 water main coupon <br />notes the following bids were received: <br />Lexington Trust Co. 1001.55 <br />Merrill, Oldham & Co. 1001.90 <br />Atlantic National 1001.24 <br />F. L. Dabney & Co. 1001.60 <br />Estabrook & Co. 1000.50 <br />The bid was awarded to Merrill, Oldham &, Co. <br />Bids were received in response to the request of the Superin- <br />tendent of -Public Works for sidewalk work under the following spec- <br />ifications: <br />SPEC IFICATIOITS FOR GSA'rOLITHIC SIDE.- <br />WALKS IN T0WN OF LEXI1TGTO7, MASSACHUSL'TTS. <br />Gravel must be Screened or Crushed Stone that will pass through <br />1" screen. <br />Sand rust be clear, sharp sand, free from all loam or other for- <br />eign matter. <br />Cement must be high grade ce^7e_a of any standard American riake <br />and approved by Engineer. <br />EXCAVATI}IG : <br />All loam must be excavated and be piled tiv_lere directed boy Engineer. <br />FILLING: <br />Fill to within 4" of finished grade wit:- course gravel or cinders <br />thoroughly soaked with water a -ad tw,iped so there will not be any voids <br />or soft -.)laces. <br />r V JYuU : <br />Build forms of 2 x 4 Spruce planed l side, put down in proper <br />manner and brought to grades given b. Engineer. <br />CONCRETE: <br />Concrete to be *fixed 1 pert cement 3 parts sand and 5 parts gravel. <br />This to be poured it forms and broug1it to within 1" of finished surface. <br />Cut joint across walk everg 5 ftl' ti* <br />. anc'. fill' sand. Concrete to be <br />properly tamped, over this spread 1" of concrete mixed as follows: 1 <br />part cement, 2. parts sand, and 1/2 la::ap black, to eac? bag cerae�.t. T�zis <br />to be trowelled to true ezen surface and cut across walk over sand joint <br />below. If walks are laid in :iot we•=.t.'�ier, 1 -Keep s,-uie covered for 48 hrs. <br />and sprinkle several tides a. day for 4 or 5 days. <br />