Laserfiche WebLink
<br />Lexington Tree Committee, Lexington, MA, Minutes of January 15, 2009 <br /> <br /> <br />1. Attendance: John Frey, Anne Senning, Nell Walker, Karen Longeteig, Jewel Kuljian, Jeanne Krieger, <br />Gerry Paul, Jim Wood. The meeting was called to order at 7:42 a.m. <br />Scribe: Karen Longeteig was appointed as scribe. The minutes of the December 4, 2008 meeting were <br />approved with two minor corrections. <br /> <br />2. Tree Warden’s Report: Dave Pinsonneault could not be present so he reported the following statistics <br />by an email to Chairman Frey: <br /> (a) Tree City USA application has been submitted. <br />(b) Tree Bylaw statistics: 624 sites/481 closed, 775 trees to be removed/537 actually removed, <br /> and 1862 trees to be planted/1177 planted. <br /> <br />3. Town Engineering Division Report: Dave Cannon from the Engineering Department visited the <br />meeting to ask for input on the Spring Street sidewalk project, and to answer questions about ‘protocols’ <br />for making trees and sidewalks co-exist. <br /> (a) Spring Street project: Mr. Cannon presented plans showing three alternatives for the sidewalk <br />placement on Spring Street, along with statistics showing how many existing trees would be impacted <br />under each plan. He judged Alternative #3 to have the least impact on trees and property, while best <br />serving pedestrians. He walked the site with Tree Warden Pinsonneault. Where trees may be impacted, <br />they will approach individual homeowners to try to resolve issues while saving the tree if possible. There <br />nd <br />will be public hearings on the Spring Street project on January 22 , Clarke School Auditorium, 7:30 p.m. <br />The Tree Committee voted unanimously to endorse Alternative 3 as the first priority. <br /> (b) The Committee had prepared a long list of tree/sidewalk items to ask Mr. Cannon, but given <br />the time already spent, resolved to limit the questions to two: 1. Is there a policy of systematically paving <br />over tree pits where a tree has been removed? 2. Is there a possibility of re-opening sidewalk areas for <br />tree planting? Taking the items together, Mr. Cannon said there was no policy of paving over; it was on a <br />case-by-case basis. Others having input on a site might be the Highway Department , Water Department, <br />etc. as well as the Tree Warden. However, after a long hiatus the Town now has a new head Engineer, <br />John Livsey, who has just come on the job but who can be expected to address such questions in a <br />systematic way. He agreed that discussion of options is necessary, especially in tree-deprived areas. <br />Jim and Gerry suggested that we could develop a plan for a whole street in East Lexington, including <br />retrofitting the closed-up sidewalk areas. A subcommittee was formed on the spot of Gerry, Jim, John & <br />Anne. They will meet on a date to be decided by email. <br /> In answer to another question, Mr. Cannon said that his division has adopted the structural soil <br />system as a standard detail. It is cheaper than a coffered treeway, and is more of a self-sustaining, <br />natural system. <br /> <br />4. Tree Nursery: <br /> a. John reported that the response to the Town Manager’s query about the nursery was sent out <br />with copies to all Tree Com members. <br /> b. Jim reported that the species selection subcommittee had met and developed a draft list. He <br />searched for nursery sources amongst four nurseries: Baileys, Weston, Bigelow and Sylvan. Bare-root <br />trees are not a common item and Baileys has the most. Jim distributed a list of species and numbers of <br />each, totaling 220 trees. He will continue to look for sources; presumably some trees on the list will not <br />be found, and others will be pared down as necessary until we purchase about 130 trees for spring <br />planting. <br /> <br />5. Tree Budget Meetings: <br /> Gerry has been meeting with the Town Manager and the Selectmen as they develop their budget. <br />He noted that, as of the last draft, tree planting was proposed for $14K (out of our request for $24K), as a <br />Program Improvement item. There is still a gap of $2.3 million in the Town budget. Gerry got enough <br />signatures to put a warrant article on the Town Meeting. The Committee’s sense was that the $14K was <br />acceptable, but if we get nothing we will go to the floor of the Town Meeting. Jeanne noted that the $14K <br /> <br />