Laserfiche WebLink
<br />PLANNING BOARD MINUTES <br />MEETING OF JUNE 15, 2016 <br /> <br />A meeting of the Lexington Planning Board, held in the Battin Hall, Cary Memorial Building was <br />called to order 7:07 p.m. by Chair Nancy Corcoran-Ronchetti, with members Charles Hornig, <br />Tim Dunn, Richard Canale, and Ginna Johnson and planning staff Aaron Henry, David Fields <br />and Lori Kaufman present. <br /> <br />************* UPCOMING MEETINGS AND ANTICIPATED SCHEDULE************** <br />Discussion of upcoming meeting schedule and known agenda items: <br />The Board decided to meet June 29 instead of July 6, 2016. <br /> <br />*********************DEVELOPMENT ADMINISTRATION************************ <br />8 Adams Road, sketch Site Sensitive Development (SSD): <br />Gary Larson, Landscape Arichtect and Mr. and Mrs. Hiller, the owners, Pat Nelson, attorney, and <br />Rick Waitt with Meridian Associates were present. Mr Larson said this is a sketch site sensitive <br />development for a 1.4 acre site. There are two structures and on the site a single family home and <br />detached garage. The proof plan shows by right the site can be developed with two lots. <br />Board Comments: <br /> <br /> Was the driveway curbcut changed? Yes but maybe moved closer to the original curbcut. <br /> <br /> Recommend that the looped driveway be removed to add open space. <br /> <br /> The main concern is to preserve the existing house and the existing characteristics of the <br />site. <br /> <br /> Want conditions added for preserving parts of the house and some trees. The applicant <br />would consider those conditions. <br /> <br /> Do you know the historic history of the house and property? Mr. Larson said there was <br />history but he not familiar with it. Look up the history of the site before you come back <br />before the Board. <br /> <br /> Show how a conventional subdivision plan would fit in. <br /> <br />Audience comments: <br /> <br /> The attorney for the 10 Adams Street abutter was concerned about about the screening, <br />scale, massing, and materials of the proposed building. The next step should include <br />those items and photo simulations. <br /> <br />