|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-05-15-CONCOM-min
Breadcrumb Navigation:
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2017
>
2017-05-15-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:36 PM
Creation date
10/24/2017 9:10:20 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TOWN OF LEXINGTON, MASSACHUSETTS <br />CONSERVATION COMMISSION <br />MINUTES <br />Monday, May 1 2017 <br /> 6:30 P.M. <br />Hudson Room, Cary Hall <br />1605 Massachusetts Ave <br />Chair Philip Hamilton opened the meeting at 6:32pm in the Parker Room <br />Commissioners Present: Phil Hamilton, Alex Dohan, Kevin Beuttell, Duke Bitsko, Dick Wolk <br />Others present: Karen Mullins, Conservation Administrator and Casey Hagerty, Conservation <br />Department Assistant <br />6:32pm <br />Review Restrictive Covenant for 435-439 Lincoln Street to determine compliance with Order of <br />Conditions requiring a Conservation Restriction <br />This will be discussed at the next meeting. <br />Approve insignificant plan changes at 24 Constitution Road, DEP 201-1052, BL 1009 <br />Ms. Mullins explained that the applicant wishes to remove one additional tree on the property. <br />Motion to approve the plan change made by Mr. Wolk and seconded by Mrs. Dohan. Vote: 5-0 <br />in favor. <br />6:38pm <br />Issue Certificates of Compliance: 8 Lake Street, DEP 201-1009, BL 966 <br />Rob Burge, Lexington Development Group, explained that their engineer has submitted a <br />mounding analysis to the Engineering Department to demonstrate that two feet of separation in <br />the infiltration system is not required in this situation. Ms. Mullins explained that the <br />engineering department has approved of the analysis. <br />Motion to authorize Ms. Mullins to sign off on the Certificate of Occupancy made by Mrs. <br />Dohan and seconded by Mr. Beuttell. Vote: 5-0 in favor. <br />Issue Certificates of Compliance: 6 Blueberry Lane, DEP 201-999, BL 956 <br />Ms. Mullins explained that they only outstanding condition with this site was the regrading of the <br />area around a protected tree. She stated she is just waiting for an updated as-built plan. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.