<br />Community Preservation Committee Minutes <br /> <br />November 16, 2006 <br /> <br />Attending: Joel Adler, Norman Cohen, Marilyn Fenollosa, Wendy Manz, <br />Leo McSweeney, Richard Pagett, Sandy Shaw, Betsey Weiss, Richard Wolk <br /> <br />The meeting was called to order at 5:05 p.m. <br /> <br />The meeting was devoted to hearing the presentation of the projects submitted for the Annual <br />Town Meeting next spring. <br /> <br />Center Playfield Drainage Improvements <br />This project was presented by David Pinsonneault of the DPW. The request is for $90,000.00. <br />He said that there has been a drainage problem since 1940 and the requested study by an <br />engineer would define the problem and suggest corrective action that the Town might take in <br />future years. He said the Conservation Commission would be involved in the project. <br /> <br />Munroe and Ye Olde Burial Grounds <br />This project was presented by David Pinsonneault of the DPW, David Kelland, Chair of the <br />Historical Commission, and Susan Bennett, Executive Director of the Lexington Historical <br />Society. The request is for $159,000.00. Dave said the Town had hired a conservator who <br />outlined a project for the preservation of historic markers at Ye Olde Burying Ground and the <br />Munroe Cemetery. Dave said that the markers are damaged by the natural aging process, due <br />mostly to our weather conditions. The reasons for this project are to preserve a very valuable <br />asset of our Town and for the safety of those who visit the cemeteries. He stated that the <br />proponents will seek whatever grants may be available. <br /> <br />Steel Lintels at Cary Hall <br />This project was presented by Dave Canon, Assistant Town Engineer. The request is for <br />$14,200.00. It is for the rehabilitation and replacement of steel lintels at Cary Hall. There are 15 <br />steel lintels to be removed, sandblasted and installed. There will be some masonry work to blend <br />lintel work with the existing exterior. <br /> <br />Fire Monitoring System <br />This project was presented by Susan Bennett. It is to improve fire monitoring systems at <br />Buckman Tavern, Munroe Tavern and the Hancock-Clarke House. The new wireless system <br />will be done working with the Lexington Fire Department. The request is for $18,120.00. Susan <br />said there is a great need for this updated system. <br /> <br />Buckman Tavern Boiler <br />This project was presented by Susan Bennett. It is for a new oil burner and oil take at the <br />Buckman Tavern. The present boiler is 30 years old and the tank is in the ground. There will be <br />a new boiler and tank. The old tank will be removed from its present location. The request is for <br />$14,000.00 <br /> <br />Ms. Weiss suggested that Susan Bennett update the committee on her meeting with the <br />Appropriations Committee. Susan, Betsey and David Wells had met with the Appropriation <br /> <br />