Laserfiche WebLink
<br />Community Preservation Committee <br /> <br />Public Hearing <br /> <br />October 5, 2006 <br /> <br /> <br />Attending: Joel Adler, Norm Cohen, Marilyn Fenollosa, Wendy Manz, Leo McSweeney, <br />Richard Pagett, Sandy Shaw, Betsey Weiss <br /> <br />Not attending: Dick Wolk <br /> <br />The meeting was called to order at 7:35 p.m. by Betsey Weiss, CPC chair. <br /> <br />1. Review Projects for possible Special Fall Town Meeting: <br /> <br />a. Historic Study of the Hancock-Clarke House – Request for $25,000 – Susan Bennett, Executive <br />Director, Lexington Historical Society <br /> <br />Ms. Bennett described the project: this request is to fund a predevelopment study for the <br />restoration of the Hancock-Clarke House. The Lexington Historical Society (LHS) has received <br />a grant from the Massachusetts Historical Commission (MHC) that must be matched with like <br />funds. The goal of the project is to identify existing conditions that need repair. The LHS is <br />already aware that a too-heavy roof and the transfer of the property back and forth across <br />Hancock Street are causing the walls to bow out. The project will generate detailed architectural <br />drawings, describe options for wheelchair access and provide the basis for construction and bid <br />documents for the actual restoration. This building, a National Historic Landmark, is extremely <br />important to the town and has been under the stewardship of the LHS since 1896 when the <br />Society saved the building from demolition. <br /> <br />Norm Cohen: if a special town meeting is not held, and the project is deferred to Spring <br />Town Meeting, will the project be in jeopardy? Ms. Bennett – No, if the matching grant is not <br />received by the LHS, they will use funds from their endowment fund. The project is already <br />proceeding, on schedule. <br /> <br />Joel Adler: is the MHC grant contingent on receipt of CPA funds? Ms. Bennett – no, it is <br />up to the LHS to provide the matching funds from whatever source they choose. <br /> <br />Mr. Adler: who owns the building? Ms. Bennett – the LHS owns the land and buildings. <br /> <br />Leo McSweeney: what is the anticipated total project cost? Ms. Bennett – probably <br />more than $500,000, with additional funds needed to construct the wheelchair access. The <br />biggest modifications will be made to the northern, newer part of the building; the historic parts <br />will only be slightly impacted. <br /> <br /> <br />