Laserfiche WebLink
<br />TOWN OF LEXINGTON, MASSACHUSETTS <br />CONSERVATION COMMISSION <br />MINUTES <br />Monday, February 6, 2017 <br /> 6:30 P.M. <br />Hudson Room, Cary Hall <br />1605 Massachusetts Ave <br />Chair Philip Hamilton opened the meeting at 6:32pm in the Hudson Room of Cary Hall <br />Commissioners Present: Phil Hamilton, Duke Bitsko, Alex Dohan, Kevin Beuttell <br />Others present: Casey Hagerty, Conservation Department Assistant <br />6:32pm <br />Lincoln Street Sidewalk discussion <br />Todd Burger and Josh Summers, residents of Lincoln Street, explained to the Commission that <br />they are submitting a petition to the TSG Group to get a sidewalk extended from Marrett Road <br />down Lincoln Street. They explained that the situation is currently very dangerous. The proposed <br />sidewalk would connect key locations and increase pedestrian safety. The proposed sidewalk <br />would parallel Idylwilde Conservation Area, but they are unsure which side of the street it will <br />run on; the Engineering Department will decide that. They understand that this would likely need <br />to get approved through a Conservation permit. <br />At this point Mr. Burger and Mr. Summers were just making the Commission aware of the <br />petition and to ask for feedback. <br />6:45pm <br />Compliance discussion regarding 9 Luongo Farm Road, DET 13-08 <br />Bob Phelan- builder, Mike Capichetti- Project Engineer <br />Mr. Phelan explained that this project was approved by the Commission through a Negative <br />Determination in 2013. The entire project is outside of the 100 ft. buffer. There were some <br />changes made to the house, but it was made smaller and pulled further from the wetlands. <br />Mr. Capichetti stated that the only outstanding problem was whether the drainage complied with <br />the Conservation Commission decision. The Town Engineering department had some questions <br />about the test pits on site and whether the soils were consistent to what was proposed. Mr. <br />Capichetti explained that they have provided the Engineering department with updated <br />information. <br />Mr. Phelan stated that they will come back on 2/21/2017 once the Engineering Department <br />approves the project. <br /> <br />