|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2023-12-14-LCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Center Committee-LCC
>
Minutes
>
2023
>
2023-12-14-LCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 9:08:43 AM
Creation date
2/13/2024 9:04:17 AM
Metadata
Fields
Template:
Archives
Year
2023
Author or Source
Pamela Lyons, Committee Member
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Town of Lexington <br />Lexington Center Commi?ee <br /> <br />th <br />Minutes for the mee?ng of December 14, 2023 held at 8:30 am in Estabrook <br />Hall, Cary Hall Building, Massachuse?s Avenue, Lexington, Massachuse?s in <br />person and remotely. <br />Members present: Eric Ballard, Upasna Chhabra, Katherine Huang, Frederic <br />Johnson, Jeffery Lyons, Pamela Lyons, Innessa Manning, Jerold Michelson (Chair), <br />Pamela Shadley <br />Liaisons: Doug Lucente, Select Board, Charles Hornig, Planning Board, Sandra <br />Shaw, Council on Aging, Sandhya Iyer, Economic Development Director, Lorraine <br />Welch, Economic Development Coordinator, Captain Chris Barry, Lexington Police <br />Department <br />Others: Heather Hartshorn, Chamber of Commerce, Sharon Spaulding, 1666 Mass <br />Ave, Abby McCabe, Town Planner <br />We began with the DPW update: We were asked to let Dave Pinsonneault know if <br />there are any Center maintenance and repair issues. <br />John Livsey noted that the Ba?le Green Streetscape is in its final cleanup mode, <br />the night ligh?ng is opera?onal and will be connected with the Center master <br />ligh?ng soon (so the off/on will follow natural day and night.) Over at Emery Park, <br />the brick and bus shelter founda?on is in – it will take two days to install the <br />shelter, weather permi?ng. Obviously the founda?on going in for the bus shelter <br />is unrelated to the two trees coming down. Belfrey related landscaping will go in <br />next Spring. Capt. Barry told us that the LPD should be moving into the new <br />police sta?on next June. John then gave an overview of the 1666 and Love at First <br />Bite bus stop op?ons. It looks like there will be room for a bench or benches in the <br />LAFB loca?on and perhaps other op?ons for street ameni?es. The es?mated cost <br />is $10 to 20K which is within DPW’s exis?ng budget. This could go in during the <br />2024 construc?on season using the Ba?le Green Streetscape contractor. DPW has <br />the brick already. January 22, 2024 is the tenta?ve date before the Select Board. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.