Laserfiche WebLink
PLANNING BOARD MINUTES <br /> MEETING OF AUGUST 25, 1994 <br /> The meeting of the Lexington Planning Board held in Room G-15, Town Office Building, was called <br /> to order at 7:37 p.m. by Chairman Domnitz, with members Canale, Davison, Grant, Planning Director F, <br /> Bowyer, and Assistant Planner Marino present. Mr Merrill was absent. <br /> 170. Review of Minutes: The Board reviewed and corrected the minutes for the meeting of July 28, <br /> 1994. On the motion of Mr Canale, seconded by Mr. Grant, it was voted unanimously 4-0 to approve <br /> the minutes, as amended. <br /> ************ ADMINISTRATION OF LAND DEVELOPMENT REGULATIONS ************* <br /> SUBDIVISION OF LAND <br /> 171. Prescott Lane. off Lowell St. The Board reviewed and edited a draft decision, prepared by the <br /> staff, on the Prescott Lane Preliminary Subdivision Plan submitted on July 15, 1994 by Pat and John <br /> Austin. On the motion of Mrs Davison, seconded by Mr. Canale, the Board voted unanimously to: <br /> 1. approve with conditions the preliminary subdivision plan entitled "Prescott Lane", by Larson <br /> Associates, Inc. and Meridian Engineering Collaborative, Inc., dated July 5, 1994; <br /> 2. approve the wording of the draft decision dated August 25, 1994, as amended. <br /> DETERMINATION OF GRADE AND CONSTRUCTION OF UNACCEPTED STREETS <br /> 172. 21 Haves Lane, CUS 94/1 Definitive Street Construction Plan: The Board reviewed a draft <br /> decision on the 21 Hayes Lane Definitive Street Construction Plan submitted by Daniel and Lynn <br /> Perry on July 18, 1994. On the motion of Mr. Grant, seconded by Mr. Canale, the Board, on a <br /> unanimous vote: <br /> 1. determined that Hayes Lane, as it provides frontage for lot #216C on Assessors Map #48, <br /> is not presently of adequate grade and construction but will be of adequate grade and <br /> construction if the improvements shown on the plan entitled Site Construction and Utilities <br /> Plan, and the Street Layout and Profile plan, both dated July 16, 1994, prepared by Lanata <br /> and Associates, Inc., for Mr. and Mrs. Daniel Perry, are made; <br /> 2. approved the plans entitled Site Construction and Utilities Plan, and the Street Layout and <br /> Profile plan both dated July 16, 1994, prepared by Lanata and Associates, Inc., for Mr. and <br /> Mrs. Daniel Perry, as the definitive street construction plan, with waivers from the Stan- <br /> dards for Grade and Construction of Unaccepted Streets Relative to New Dwellings as set <br /> forth in its decision; <br /> 3. approved the wording of the draft decision dated August 19, 1994. <br /> 173. 4 Hunt Road. CUS 94a: Preliminary Street Construction Plan: The Board reviewed a draft <br /> decision, prepared by the staff, on the preliminary street construction plan submitted July 14, 1994 by <br /> Richard Curtin. On the motion of Mr Canale, seconded by Mrs. Davison, the Board voted unani- <br /> Rmously to: <br />