|
Lexington Home Page
|
Help
|
About
|
Browse
Search
Planning Board minutes 09-18-1995
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1990-1999
>
1995
>
Planning Board minutes 09-18-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2024 2:17:59 PM
Creation date
1/24/2024 2:17:59 PM
Metadata
Fields
Template:
Archives
Year
1995
Department
Planning
Keywords or Subject
Planning Board minutes 09-18-1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING BOARD MINUTES <br /> MEETING OF SEPTEMBER 18, 1995 <br /> The meeting of the Lexington Planning Board held in the Selectmen's Meeting Room, Town Office <br /> Building, was called to order at 7.40 p.m. by Chairman Davison, with members Canale, Davies, Merrill, <br /> Planning Director Bowyer, and Assistant Planner Marino present. Mr. Grant arrived during Item 140 <br /> *************************** PLANNING DIRECTOR'S REPORT ************************** <br /> 139 Recent Activity <br /> a. Munroe Village Subdivision: Mr. Bowyer reported that as construction on the Munroe Village <br /> subdivisions started, he noticed there is no path to connect the end of the Munroe Village subdivision street <br /> to property the Town will acquire in a land swap approved by the 1995 Town Meeting. The definitive <br /> subdivision plan was approved before the land swap was voted and does not include the connection. He said <br /> he has alerted the Conservation Administrator who will ask David Williams, former chairman of the <br /> Conservation Commission and the principal facilitator of the land swap, to look into the issue. <br /> b. New House Construction on Charles and Bowker Street: Mr. Bowyer said he received an inquiry from <br /> a Mr. Bowker concerning a house being built at Charles and Bowker Street. Mr. Bowker wanted to know <br /> how such a large house could be built on a small lot. Mr. Bowyer responded that the lot in question is <br /> probably a grandfathered building lot. <br /> c. Day Care Center on Marrett Road: Mr. Bowyer reported there is a proposal for a day care center at 410 <br /> Marrett Road. He said that some abutters have expressed concern about locating the center there, citing <br /> traffic safety concerns. After a recent change in the State Law, the Zoning By-Law permits day care centers <br /> by right in the RO and RS zones. <br /> d. 915-917 Massachusetts Avenue. Sketch Preliminary Subdivision Plan. Rollout: Mr. Bowyer rolled out a <br /> sketch preliminary plan for the development of land at 915-917 Massachusetts Avenue. It was submitted by <br /> Philip Saunders, Jr., Trustee, for Ronald A. Laing, on September 15, 1995 The staff has not yet reviewed <br /> the plan in detail. The time for action on this plan expires on October 24, 1995 <br /> ************ ADMINISTRATION OF LAND DEVELOPMENT REGULATIONS ************* <br /> SUBDIVISION OF LAND <br /> 140 PUBLIC HEARING, Winship Common, Mark Moore Homes: Mrs. Davison opened the hearing <br /> at 7:52 p.m. Present were Mark Moore and Frank Camey of Mark Moore Homes,the applicant; Ronald <br /> Wood, landscape architect, of Guidelines, Inc., Malcolm McDowell, engineer and surveyor, of Noonan and <br /> McDowell;William Hubner, architect, of Moore Designs; and Fred Conroy, attorney, of Conroy and <br /> Coughlin. Also present was Mark Newman, attorney for the Monahan family, sellers of the property, and <br /> Gail Kiley and Max Johnson who will move and restore the Winship-Reed farmhouse. <br /> Mr. Carney gave a brief history of the planning of this project thus far, and of the changes made in their <br /> approach to developing the site. He described the plans and highlighted the notable features of the design. <br /> He noted that this is a proposal based on the two plans the Board reviewed at the sketch plan stage in the <br /> spring. The 51 Lowell Street property has a total of about 4 75 acres. Four single family house lots,that <br /> have frontage on Summer Street and Lowell Street, have already been created by the endorsement of the <br /> Approval Not Required plan. Those lots are not part of the cluster subdivision plan and are separate <br /> building lots that do not need approval by the Planning Board. This plan involves moving the existing <br />
The URL can be used to link to this page
Your browser does not support the video tag.