Laserfiche WebLink
Drummer Boy property and instead create a new segment over town property. There are about 60-70 feet of <br />wetlands on Rangeway. Keith and Mike walked this area with Phi Hamilton. Keith has requested a site walk <br />with Karen and Amber, hopefully this week or early next. There was a question about who would build the trail. <br />It would most likely be done by the stewards. The needed construction is too involved for a scout project. In <br />terms of cost of materials, a request for funds could be made to the Recreation Trails Program or to the Judy <br />Record Fund. The estimated cost is between 3 and 5 thousand dollars. <br /> <br />AGM/LVB Connector: Keith and Mike met with Facilities Manager, Mike Cronin, Karen, and Amber. <br />The old Harrington school will be demolished and become playing fields. There is also the MWRA stormwater <br />project in this area. It would be possible to build a new trail through the woods behind the playing fields. We <br />would need to get on Conservation’s planning schedule for this. Another possibility is to use streets for a part <br />of the propose route because we can’t do the whole thing off streets at this point. It could be viewed as a <br />“service trail” for the town, and it could also be part of “Safe Routes to Schools.” Using sidewalks, we could roll <br />out route 22 and part of 19. <br /> <br /> <br />The meeting was adjourned at 6:07 pm. <br /> <br />The next meeting will be held on 18 September. <br /> <br />Respectfully submitted, <br /> <br />Eileen Entin, Acting Secretary <br /> <br /> <br /> <br />