Laserfiche WebLink
May 15, 2023 2 <br /> <br />2. Specification of required payments <br />The tree warden determines a final value for the permit fee and required mitigation payment <br />based on a visit to the site shortly before a certificate of occupancy is to be issued. There are <br />several places where payments that are required are specified or can be inferred. <br />• Tree warden bylaw activity spreadsheet - this spreadsheet has been used by the tree <br />warden since the inception of the bylaw2. It lists the number of trees removed and the <br />number of DBH (diameter at breast height) inches removed. The actual number of <br />inches for which a fee or mitigation payment must be made may differ from the <br />inches removed because: <br />o Trees may have been planted to reduce the required mitigation payment <br />o A removed tree may have had a diameter equal or greater than 24 DBH inches <br />in which case the diameter is multiplied by 2 or 4 (after July 2017 or July <br />2021 respectively) to obtain the inches to be mitigated <br />o Removal of fewer or additional trees may have made after an entry in the <br />spreadsheet is created but the entry has not been updated. <br />• The Tree Removal Permit created in the online system. However, in many cases this <br />is not filled in by the applicant or tree warden (or is filled in incorrectly). <br />• Comments in records in the Viewpoint Cloud system – this is not done consistently <br />There is now no place where fee and mitigation payments that are required are consistently and <br />reliably recorded and no place where mitigation plantings are consistently recorded. However, <br />we employ whatever data is available to document our findings with awareness of the caveats <br />above. <br />This report does not address the issue of whether required payments have been determined <br />properly. That issue is addressed in two earlier reports1,3. Here we take the assessments at face <br />value to determine if the required payments have been collected. <br />The issue of whether fee payments have been properly collected has been raised before.3 The <br />DPW director has stated that fee payments may have been combined with other types of permits <br />and thus were not documented. This may have been the case before the use of Viewpoint Cloud <br />to record fee payments individually in late 2019, but should not be the case after that. <br />3. Who confirms that payments have been made so that demolition permits and <br />certificates of occupancy may be issued? <br />• Issuance of demolition permit - The tree warden when they declare complete the “Tree <br />Warden Review” item in the demolition permit checklist in Viewpoint Cloud. <br />• Issuance of certificate of occupancy - The tree warden when they declare complete the <br />“Tree Warden Notification” item in the new construction permit checklist in Viewpoint <br />Clout. <br /> <br />2 Entries in this spreadsheet were no longer made after October 14, 2021. <br />3 Report to the Tree Committee on Bylaw Enforcement Concerns <br />https://records.lexingtonma.gov/WebLink/0,0,0,0/doc/2487316/Page1.aspx