Laserfiche WebLink
2 <br /> <br />39 MARRETT ROAD, LEXINGTON, MASSACHUSETTS 02421 <br /> <br /> <br /> <br />products. Products considered during the Center Recreation field reconstruction project included <br />the durable engineered southern pine wood particle infill. She explained that organics are cooler <br />in general, however, a lot of collegiate clients do not use the organics because they hold water <br />and can freeze, making them unsafe to use in the shoulder seasons. She stated that the working <br />group will have to determine what the tradeoffs are and what they find to be acceptable . <br />Melissa Battite added that the Town strives to meet the demands and the needs for play, while <br />also looking at it from a maintenance standpoint. Currently the Town maintains both natural <br />grass and synthetic turf, and to introduce a 3rd fill would add additional impacts to maintenance <br />costs. <br />Claire Sheth stated that Lexington is in New England and therefore, she is in favor of synthetic <br />turf for safety. She is concerned that there might be a push to play on surfaces that are not safe – <br />placing ankles, heads, and joints at risk because people will play on them regardless of <br />conditions. <br />Tim Clackson, representing the Lexington United Soccer Club (LUSC), is on the Board and <br />involved in scheduling for the teams. The program runs year-round soccer for 1400 youth, <br />mainly in grades K – 8 with some high school programs. He stated that they have a great <br />collaborative relationship with Lexington Recreation and the Recreation Committee. Having <br />consistent playability is key and urged the group to think about the shoulder seasons. He feels it <br />is important to find the maximum field usage for the maximum residents. The synthetic turf <br />(based on the field study) is the way to go. He added that it is important to recognize that when <br />the access goes down during the high school renovation, field space will be at an even greater <br />shortage. On behalf of LUSC, he supports the analysis that has been done. <br />Mark Sandeen, member of the Select Board, asked for confirmation that the Recreation <br />Committee is proposing to procure PFAS-free fields. He also asked about the disposal of <br />existing field material, are there insurances from contractors that the materials will not end up in <br />waste water or incinerated in the air? Ms. Buczynski responded that they will reuse materials <br />whenever possible, however, no one will currently take the carpet for recycling so the only option <br />is repurposing. <br />Weiwei Li commended the team for a great presentation and thanked everyone for their work. <br />He stated his support for the project and asked if there were any details on the proposed timeline? <br />Ms. Buczynski responded that those details are not available yet since the project has not been <br />approved. Some study work will be needed first and she expects a 10 – 12 week construction <br />process. <br />Deepika Sawhney, liaison to the School Committee, questioned if more than one field will be <br />done at a time and if the construction will impact the boundaries between them. Lisa O’Brien <br />confirmed that only one field will be offline at a time. Ms. Buczynski added that none of the <br />fields touch each other and there are pathways with timbers bordering the fields. <br />Cindy Arens, Chair of the Sustainable Lexington Committee and part of the Lincoln Park <br />working group, stated that she looks forward to seeing the presentation on the website and added <br />that she may have some more questions following review <br />Resident, Lin Jensen, asked the Committee what signage will be posted at the field. She <br />referenced the Department of Environmental Health’s webpage on artificial turf fields and tips on <br />safe use of the fields. She would like the group to consider having signage with statements like <br />“always wear shoes and keep mouth closed.” Christian Boutwell responded that based on the <br />project and available budget, he believed this would be fine. Melissa Battite said such signage <br />would be similar to what is at playgrounds on how to safely use them. <br />Rick DeAngelis added that email communication will be sent out to the user groups. The <br />Recreation Committee serves the entirety of the community and the working group came out of <br />the collaborative efforts across many groups.