Greenways Corridor Committee <br />November 3, 2022 <br />Parker Room - Town Office Building, and zoom <br />Lexington, Massachusetts <br />Members Present:Mal Crawford*, Alex Dohan, Peggy Enders, Eileen Entin, Bob Hausslein, Bobak Moshiri, Keith <br />Ohmart, Stephen Perkins <br />Associate Members Present:Susan Kenyon*, Mike Tabaczynski <br />Other Attendees:Yifang Gong, prospective committee member <br />*via zoom <br />Votes: Meeting minutes of September 8, 2022:Approved (there was no October 2022 meeting) <br />Letter supporting Trees into Art project:Approved - Keith will draft <br />Reports/Updates: <br />●Keith introduced Yifang Gong as a prospective member of the GCC <br />●December meeting will be held on the 8th, not the 1st as previously scheduled. <br />●The GCC Charge revisions are complete and in Suzie Barry’s hands for the Selectboard to approve. <br />●Peggy reports that the Meagherville boardwalk project is nearly complete - should be finished up on <br />November 12, thanks to work by soon-to-be Eagle Scout Ian Lewis and other volunteers. <br />●Landlocked Forest signage permission is still up in the air. <br />●Mike and Keith met with Judy in the Town IT department to discuss getting the ACROSS Lexington routes <br />onto the Town GIS system. It should be fairly simple to get the information uploaded, but we need to decide <br />just what we want to show. Mike will forward us some background to explore the setup. <br />●Peggy is now officially representing GCC on the WalkMassachusetts network. <br />●Keith has been adjusting ACROSS signs as he sees the need on his walks. Most are now done, but keep an <br />eye out. <br />●The Program Improvement Request funds for FY23 currently have a remainder of about $1500 since design <br />expenses for the recent brochure were lower than expected. We should spend the money, or it will <br />“disappear”. We need to update some of the wayfinding signs. We need some more brochure holders. Keith <br />has applied for PIR funds for FY24 to cover more route materials and brochures. <br />Current Business: <br />●Future ACROSS route possibilities - the Concord Ave/Western Greenway/Hayden Woods connection may <br />be feasible in the spring/summer of 2024. We need the Conservation Dept to give the go-ahead for the Land <br />Management Plan for the “Concord Ave parcel” and it is likely that we will be able to do that beginning in <br />July 2023. <br />●Discussion of Route 4 options. This is the Paint Mine/Wright Farm/Landlocked Forest route. The section of <br />the current route through the end of Rangeway Rd is awkward and potentially very wet. Is there a good way <br />to re-route it? Decision was made to wait until spring and review the situation at what is typically the wettest <br />time of year. <br />●Discussion of Route 19 options. This would connect Route G and Arlington Great Meadow via the <br />Harrington School. Stephen brought up the potential Mystic River Watershed Assoc. project as something to <br />consider. That project is currently not funded, but would necessitate trail diversions as they create a flood <br />control basin behind the Harrington School. We also looked at route options through Emerson Gardens, <br />Countryside Village, and around Pheasant Brook Pond. <br />●Another site walk will be conducted in the Harrington School area in the near future, as this route seems <br />more feasible to pursue at this time. A draft map should be completed before the December 8 meeting, for <br />discussion at that time.