Laserfiche WebLink
groundwater in this specific area via a series of inlets and channel connection and pumping <br />systems to discharge at the lowest point of the area. Mr. Valenti added that the proposal involves <br />a holding tank feature, that would discharge into the existing irrigation pond, and recirculate. The <br />flow of water could be controlled with that proposal. <br /> <br />Concerns of the Commission include; whether or not the state would have jurisdiction because <br />that would factor into whether the Conservation Commission could waive its performance <br />standards, if approved. Ms. Ladd stated that the project team may have to consult with the Army <br />Corps of Engineers depending on how much and where the water will be discharged to. Mr. <br />Hnatko asked if the pumping rate was known and what the requirements would be to permit such <br />discharges for pumping groundwater, as it may need a NPDES permit. Ms. Samuels asked if the <br />area of concern is a mowed grass area or a habitat area. Ms. Battite responded that the area of the <br />two holes is maintained as a fairway, however in the wettest of conditions the golf course is not <br />able to maintain it. Mr. Bitsko asked if the construction of boardwalks was a consideration as an <br />alternative. <br /> <br />7:47 PM New Public Meetings/Hearings <br /> <br />Notice of Intent (Lexington bylaw only): 95 Hayden Avenue and 128 Spring Street <br />ViewPoint Cloud Permit# CNOI-22-25 <br />Applicant/Property Owner: Hobbs Brook Real Estate LLC <br />Project: drain connection to an existing municipal storm drainage system <br />Documentation Submitted: <br />⎯ Notice of Intent application and attachments; Prepared by: Scott Turner, Environmental <br />Partners Group, LLC; Date: October 2022; <br />⎯ Planset “Site Plan Review”; Prepared by: Margulies Perruzzi and Environmental <br />Partners; Date: September 2022; <br />⎯ Stormwater Report; Prepared by: Environmental Partners; Stamped and signed by: Scott <br />D. Turner, PE Civil No. 41775; Date: July 2022; <br />⎯ Stormwater Permit Application; Prepared by: Environmental Partners; Stamped and <br />signed by: Scott D. Turner, PE; Date: July 2022; <br />⎯ Draft Stormwater Pollution Prevention Plan (SWPPP); Prepared by: Environmental <br />Partners; Date: July 2022; <br />⎯ Report “Subsurface Conditions and Geotechnical Data”; Prepared by: Haley & Aldrich, <br />Inc.; Date: May 2022; <br />⎯ Report “Geotechnical Design Investigation”; Prepared by: Haley & Aldrich, Inc.; Date: <br />March 2013; <br /> <br />Mr. Scott Turner, Environmental Partners, presented. Mr. Turner stated that the applicant is <br />requesting a waiver of the bylaw performance standard Section 5(2), for a minor increase in the <br />1-year storm runoff volume stormwater discharge (3 percent). Two large office buildings are <br />being proposed on this site outside the 100-foot buffer zone to wetlands, with the exception of a <br />trail connection system that was previously approved through a Negative Determination. <br /> <br />Questions and Comments from the Commission: