|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-10-17-ConCom-min
Breadcrumb Navigation:
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2022
>
2022-10-17-ConCom-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 9:12:29 AM
Creation date
11/22/2022 10:41:32 AM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Holly Samuels – Aye <br />Phil Hamilton – Aye <br /> <br />Certificate of Compliance: 20 Ingleside Road, ViewPoint Cloud Permit#COC-22-17, DEP#201- <br />1206. CNOI-20-35 (Partial) <br /> <br />Mr. Christopher Broyles, project engineer with Meridian Associates, presented the proposal to <br />the Commission for granite cobblestone edging along the residential driveway to allow for a <br />more stable curb down to the trench drain at the bottom of the driveway. Mr. Broyles stated that <br />the intent of the original report has not changed, only what is being channelized towards the <br />trench. He added that the trench drain is more than capable of capturing the driveway runoff <br />from a 100-year storm. The Commission approves the proposal for granite curbing and Mr. <br />Broyles will resubmit a request for a partial Certificate of Compliance once it is installed. <br /> <br />Certificate of Compliance: 72 Kendall Road, ViewPoint Cloud Permit#COC-21-15, DEP#201- <br />1170, CNOI-19-32 <br /> <br />Ms. Mullins confirmed that the property owners have installed the required plantings and <br />clarified for the Commission that because the original permit was only a second story addition, <br />the Order of Conditions did not require an extensive plant monitoring period. <br /> <br />On a motion by Ms. Samuels and seconded by Mr. Beuttell, the Commission voted 6-0 by roll <br />call vote to issue the Certificate of Compliance. <br /> <br />Record of Vote as Follows: <br /> <br />Duke Bitsko – Aye <br />Kevin Beuttell – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Holly Samuels – Aye <br />Phil Hamilton – Aye <br /> <br />Certificate of Compliance: 7 Volunteer Way, ViewPoint Cloud Permit# COC-22-21, DEP#201- <br />1179, CNOI-20-8 <br /> <br />Staff were not able to review and this request will be discussed at the next public meeting. <br /> <br />Request to Extend the Order of Conditions: 16 Summer Street, DEP#201-996, BL-953, EXTO- <br />22-4 (one-year extension from 11/17/2022 to 11/17/2023) <br /> <br />On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 6-0 by roll call <br />vote to extend the Order of Conditions for 1 year to November 17, 2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.