Laserfiche WebLink
Ms. Molly Obendorf, Stamski and McNary, Inc., and Mr. David Crossman, B&C Associates, <br />presented to the Commission. Mr. Crossman delineated the wetland line at this site. Ms. Ladd <br />asked where the transect point was on the site plan and Mr. Crossman pointed to the area on the <br />plan between flags 5 and 6. Mr. Crossman said that the wetlands line was determined strictly by <br />soils because the lawn area is considered altered. Ms. Ladd requests test pit data because the <br />elevation is lower than where Flag #7 is and would like confirmation. Ms. Mullins and members <br />of the Commission will schedule another site visit with Mr. Crossman present. <br /> <br />On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 6-0 by roll call <br />vote to continue the hearing to the October 17, 2022 meeting at the applicant’s request. <br /> <br />Record of Vote as Follows: <br /> <br />Kevin Beuttell – Aye <br />Alex Dohan – Aye <br />Ruth Ladd – Aye <br />Holly Samuels – Aye <br />Jason Hnatko – Aye <br />Phil Hamilton – Aye <br /> <br />8:01 PM <br /> <br />Continued Public Meetings/Hearings <br /> <br />Notice of Intent: 710 Marrett Road <br />ViewPoint Cloud Permit# CNOI-22-22, DEP#201-1272 <br />Applicant: Melissa Lenker, Mass DOT-Highway Division <br />Property Owner: MassDOT-Highway District 4 <br />Project: Demolition and replacement of an existing vehicle repair facility and associated utility <br />and stormwater system improvements. <br />Previous Meeting Date: 9/22/2022 <br />Documentation Submitted: <br />⎯ Response to Town Engineering comments; From: Nathan C. Ketchel, GGD; Date: <br />9/26/2022; <br />⎯ Response to Cambridge Water Department; From: Nathan C. Ketchel, GGD; Date: <br />9/26/2022; <br />⎯ Plans; Prepared by: GGD Consulting Engineers Inc.; Stamped and signed by: Christopher <br />M. Garcia, PE Civil No. 45034; Date Revised: 9/26/2022; <br /> <br />Mr. Chris Garcia, GGD Consulting Engineers “GGD”, Mr. Mark Carmichael, MassDOT, Ms. <br />Melissa Lenker, MassDOT, and Mr. Carey Babyak, Johnson Roberts Architects, were present <br />during the meeting. Mr. Garcia presented the revisions made to the site plan and stormwater <br />report. The Commission was satisfied with the revisions made. The engineering department <br />comments request that an updated stormwater analysis be submitted with the correct rainfall <br />amounts. Mr. Garcia said the project team is planning to provide this revised report. Ms. Ladd