|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-05-19-LCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Center Committee-LCC
>
Minutes
>
2022
>
2022-05-19-LCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2023 10:10:54 AM
Creation date
10/4/2022 4:01:21 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Lexington <br />Lexington Center Committee <br /> <br />Minutes for the meeting of May 19th, 2022 at 8:30 am in Estabrook Hall in the <br />basement of the Cary Hall Building, Lexington, Massachusetts <br />Center Committee members present: Eric Ballard, Katherine Huang, Frederic <br />Johnson, Jeffery Lyon, Pamela Lyons, Innessa Manning, Jerold Michelson (chair), <br />Pamela Shadley, Jon Wakelin <br />Liaisons present: Michael Boudett, CEC, Sandra Shaw, COA, Casey Hagerty, EDC, <br />John Livsey, Chief Engineer, DPW, Mike McLean, Captain, LPD, Christopher Barry, <br />LPD, Dave Pinsonneault, Director, DPW, Sonya Antonyan, Chamber of Commerce <br />We began with the DPW update from Dave Pinsonneault and John Livsey: Funding <br />for the parking lots survey becomes available on July 1. The survey covers all lots. <br />Most likely we will be doing the Michelson’s lot and another lot. The timing is not <br />determined. The lots will get done after the Battle Green section of the <br />Streetscape, which comes after the Center Streetscape. ARPA funding and Safe <br />Streets funding will drive the projects. <br />The bike node will get done as a change order to the Harding Center Streetscape <br />Project. Harding is already familiar with the materials. This is in the review stage <br />now. We anticipate completion during this construction season. Bike node will <br />include benches, bike racks, repair station and solar charging station. DPW has <br />reengaged the designer for the bikeway kiosks. <br />Weekend trash pickup begins on Memorial Day and continues to Veterans Day <br />with Sunday morning pickups. Jerry Michelson suggested an earlier start to <br />weekend trash pickup. Perhaps this could be in the 2024 budget. Jeff Lyon noted <br />that tenants need to do more on policing their own trash. New light poles are <br />going in! They need brackets for hanging banners. So no banners until new <br />brackets come in. There was some discussion of technical aspects of light poles <br />and tragicomic history as to why the current poles do not include brackets. <br />John Livsey explained that the mudslab was going down and the bricklayers will <br />start next Monday and will stay until the job is complete. Spring plantings are in,
The URL can be used to link to this page
Your browser does not support the video tag.