|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-08-11-TREE-rpt2
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Tree Committee-TREE
>
Minutes
>
2022
>
2022-08-11-TREE-rpt2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 6:14:19 PM
Creation date
10/4/2022 12:27:20 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes - TREE - Tree Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 7, 2022 <br />Cc: Nancy Sofen <nsofen@gmail.com>, Marc Valenti <mvalenti@lexingtonma.gov> <br /> <br />Hi Gerry <br />The [sic] reviewed and inspected the 13 trees that were planted on the site, I will review the <br />other trees once they are planted in the new locations. <br />Thanks <br />Chris <br /> <br />• From November 11, 2020 Minutes <br />. . . Chris indicated that the builder of the Grove St. development has not yet planted the <br />required 30 [sic] trees on streets near the development. He is still in the process of <br />identifying planting locations. <br /> <br />• In October 2021 the DPW Director responded to a request for a status of the planting <br />through the Select Board Office: <br />From: Select Board <selectboard@lexingtonma.gov> <br />Date: Fri, Oct 1, 2021 at 9:53 AM <br />Subject: FW: Tree plantings required by a Select Board Tree Determination Hearing <br />To: Gerald Paul <gerryp@bu.edu> <br />Good morning, Gerry, <br />I have heard back from the DPW regarding the trees on Grove Street and here is the information <br />they had provided: <br />• 13 additional trees were planted on the property. <br />• The remaining 13 trees need to have locations determined. The original mark outs <br />were not suitable due to gas lines underground. The locations will be determined this fall <br />and either planted this fall or in the spring. Chris will coordinate with the contractor. <br />If you have any further questions, please let me know. <br />Thank you, <br />Stacey <br />In point of fact, the planting locations which were determined not to be suitable because of gas lines <br />were along Grove St and were I chosen originally as planting locations for trees to be planted by the <br />DPW as part of the fall 2019 planting. From July 9, 2020 Minutes: <br />3. Dave Pinsonneault updated us on DPW activity <br />• Fall 2019 planting: Last fall 70 trees were planted. There were some trees slated for Grove <br />St which could not be planted there due to unexpected utility lines, etc. but other locations
The URL can be used to link to this page
Your browser does not support the video tag.