Laserfiche WebLink
path between the house and the restoration area so that the planting area looks intentional. Ms. <br />Mullins stated that the Order of Conditions requires the FENO bounds to be installed along the <br />previous “do not disturb” buffers that are being restored. Mr. Lau stated that the total number of <br />FENO bounds on the site will be fifteen. The Commission requests an updated site plan showing <br />the exact location of the patio extension, paver patio spacing details, retaining wall, and FENO <br />bounds. The Commission will condition that the land surveyor stakes out the location of the <br />proposed retaining wall so that construction can begin. <br /> <br />7:00 PM New Public Meetings/Hearings <br /> <br />10 Maguire: Request for Determination of Applicability <br />ViewPoint Cloud Permit# CDOA-22-24 <br />Applicant: Bill Jenkins c/o Thermo Fisher Scientific <br />Property Owner: SRE Flag LLC <br />Project: construct a 12’ x 14’6” concrete pad to hold a nitrogen tank within the 100-foot buffer <br />zone to Floodplain (local code) <br />Documentation Submitted: <br />- Sheet V-101 “Existing Conditions”, Sheet V-102 “Existing Conditions”, Sheet SKC-101 <br />“Site Plan”, DWG STA-GEN-007 “Microbulk System Delivery Guidelines and Turning <br />Radius”, DWG STA-GEN-003 “Distance Exposures-Cryogenic Systems”, DWG STF- <br />DET-01 “Standard Bollard, Fence and Joint Details”, and DWG STF-MB-003 “Standard <br />Foundation Reference.”; Prepared by: Allen & Major Associates, Inc.; Date: 9/1/2021 <br />and revised through 7/19/2022; <br />- WPA Form 1 Request for Determination of Applicability application; Prepared by: <br />Jacqui Trainer, Allen & Major Associates, Inc.; Prepared for: Bill Jenkins, Thermo Fisher <br />Scientific; Date signed: 7/14/2022; <br /> <br />Mr. David Robinson, Allen & Major, presented to the Commission. <br /> <br />Questions and Comments from the Commission: <br />⎯ Is the concrete pad pitched towards the trench and, if so, what is the pitch? <br />⎯ Is there a town engineering review for this new impervious surface? <br />⎯ Will there be a minor slope towards the stone trench to allow for drainage? <br /> <br />Responses from the Representative: <br />⎯ There is a two-foot wide stone trench to offset the new impervious surface. There is a <br />very slight pitch about half a percent towards the trench <br />⎯ There are no town engineering comments; however, the trench is slightly oversized <br />compared to other similarly approved projects. <br /> <br />On a motion by Mr. Hnatko and seconded by Mr. Beuttell, the Commission voted 6-0 by roll call <br />vote to issue a Negative Determination with conditions. <br /> <br />Record of Vote as Follows: <br /> <br />Duke Bitsko – Aye