Laserfiche WebLink
TOWN OF LEXINGTON <br />Permanent Building Committee <br />Permanent Members <br />Jon Himmel, Co-Chairman, Charles Favazzo, Co-Chairman, <br />Peter Johnson, Philip Coleman, Celis Brisbin, Elizabeth Giersbach, Frederick Merrill <br />Police Station Members: Semoon Oh, Wendy Krum <br />Associate Members: Curt Barrentine, Henrietta Mei <br /> <br />PBC Minutes for the meeting held on: 02-3-2022 <br />Meeting was held remotely via Zoom <br /> <br />Members Present: <br />Jon Himmel, Charles Favazzo, Peter Johnson, Phil Coleman, Celis Brisbin, Elizabeth Giersbach, Frederick <br />Merrill, Semoon Oh, Wendy Krum <br /> <br />The PBC Meeting was called to order at 5:00pm <br />The SLC meeting was also called to order (Celis Brisbin, Todd Rhodes, Cindy Arens, Paul <br />Chernick, rick Reibstein and Dan Voss in attendance) <br /> <br />Tecton Architects made a presentation on the Temp Police and Police HQ projects <br /> <br />Temp Police Project <br />The GC bids had been received and the low bid was $351,100 against an estimate of $350,000. <br />Low bidder references will be checked. <br /> <br />Police HQ Project <br />Tecton provided a brief overview of the plans and elevations. There were slight adjustments in <br />the training room internal layout, Sgts office and report writing switched places, The Locker <br />room breakout was settled at three Locker rooms, and the future social services spaces was <br />shown as divided into 4 spaces to allow for multiple users. Elevation changes were limited to <br />the rear dormer. <br /> <br />Budget Update <br />• The Estimate shows significant escalation over the last year and a half in addition to the <br />cost of the added square footage. The architect discussed the changes since the July 2020 <br />SD estimate and the current: Hosmer House relocation costs were reduced to $300,000 <br />• The Construction Contingency was reduced to 7.5% <br />• A budget line was added for Building technology as well as an increased OPM fee to cover <br />extended construction duration. <br />It was asked how much of the increase might be due to added square footage and how much <br />escalation. Simply using cost / sf the added square footage could be around 3.5 million. <br /> <br />Energy Model <br />The updated energy model summary was reviewed and compared to the two baseline models <br />The updated expected energy load is 385,000 kWh based on 24/7 operations. <br /> <br />LEED/Lex Checklist/Red List <br />A cursory review shows that all Lexington initiatives are met. <br />Further 66 LEED points are projected yes with another 8 points as maybe <br />This puts the project in the area of potential LEED Gold achievement. <br /> <br />Red List <br />The four agreed upon divisions being assessed were reviewed <br />