Laserfiche WebLink
Doug asked about the guidance that we would give to the parking lot design <br />people. What does Pam’s design (from 2012) look like? How can we better <br />connect the CVS and Depot Lot. Pam gave a detailed description of her very <br />excellent CVS lot design which, among other things emphasized pedestrian safety, <br />in light of the big trucks traversing the lot. John Livsey noted that the Grain Mill <br />Alley design is complete and DPW is doing this as a change order with the <br />Streetscape contract. Mike Boudett asked “where are we trying to steer people” <br />– to Mass Ave? to the rear entrances of buildings? Two lots are bisected by the <br />bikeway – which is tricky. Pam noted the opportunity to locate bike parking near <br />Craft Cleaners and that the path from the bikeway to Edison Way can be made <br />accessible. <br />John gave an overview of the Streetscape Project mentioning: lots of bumpouts <br />for pedestrian safety, new trees!, benches and plantings with seat walls. John <br />Wakelin asked about the area from the Police Station to Woburn Street. This area <br />will be repaved only. John Livsey has seen fifteen different designs for this <br />location and none have been approved. This is the worst and most traveled <br />stretch of road in Lexington. There will be an override vote on the Police Station <br />on June 6th. Fred Johnson noted that the bad road conditions do reduce traffic <br />speed. Work is going forward April 19th (after Patriot’s Day) to November 15th. <br />John gave a helpful slide presentation of the work to be done. There is a robust <br />communication plan for businesses and residents. <br />Doug had some questions regarding apparent deterioration of tree grates. The <br />rust develops a lovely patina over time. One broken grate was run over by a truck <br />driver. That will be replaced. John described the process for dealing with <br />damaged bricks. Because it has enough width, It is unlikely that Mass Ave will ever <br />have to be closed for repaving. We might have to do one lane alternating for a <br />short time. <br />Koren Stembridge discussed the current situation at Cary Library. Glad to be open, <br />foot traffic still down, circulation is almost all back. The children’s room will be <br />renovated (having received design funds form TM a few years ago.) Current <br />design is outdated and not entirely safe We were reminded that the Library is an <br />anchor in the Center.