|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1975-12-08-AC-MIN.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
1970-1979
>
1975
>
1975-12-08-AC-MIN.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 4:12:06 PM
Creation date
3/14/2022 4:10:40 PM
Metadata
Fields
Template:
Archives
Year
1975
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
181 <br /> APPROPRIATION COMMITTEE <br /> DATE: December 8, 1975 <br /> TIME: 7 : 30 P.M. <br /> PLACE: Town Office Bldg. Room 111 <br /> PRESENT: Edward E. Furash, Chairman, Martin A. Gilman, <br /> John Blaisdell, Harry Hall, Maxine Kutchin, Patricia <br /> A. Hagedorn, Richard M. Perry, Secretary <br /> I. GENERAL DISCUSSION <br /> . 1. Planning Board Director K. Briggs to be contacted re <br /> an appointment to meet with the Committee. Mr. O'Connell <br /> ' ' will be so advised. <br /> 2. Pension Board status of job description questioned by <br /> John Blaisdell. <br /> II. MEETING WITH SELECTMEN <br /> 1. Comprehensive Drainage Study - basically update of 1975 proposal. <br /> 2. Divide drainage areas into 7 sections and study 1 each year <br /> for 7 years; estimated at $130 ,000 total of last year' s. <br /> Projected cost of $175, 000. <br /> 3. Uses: helpful to determine age, usefullness. <br /> 4 . Needs : Survey party for almost year to locate, <br /> Make anticipation of storm runoff-capacity, <br /> Prepare drainage (drafting) , <br /> Evaluation in potential of flooding - engineering, <br /> Finalized report and 5 year capital imnrovement program. <br /> Town is 100% drained but only 50% drained well per <br /> J. Martin. <br /> INFLOW-INFILTRATION STUDY - J. Martin <br /> Identical in scope to last year. <br /> Town is eligible for $80 ,00CFederal Grant. gwe <br /> Meeting adjourned at 10 : 00 P.M. <br /> Next meeting is scheduled for Saturday, December 13 , 1975 <br /> Respectfully submitted, <br /> P <br /> Richard M. Perry/mo' <br /> Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.