|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1974-02-04-AC-MIN.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
1970-1979
>
1974
>
1974-02-04-AC-MIN.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 11:00:31 PM
Creation date
3/9/2022 4:11:28 PM
Metadata
Fields
Template:
Archives
Year
1974
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a�"a�_ <br /> ST . H�CR�ATIGt�t <br /> Present: R. Wortheim C. Gallagher <br /> D. Busa H� �isenber� <br /> R. �ertini <br /> Friori_tv List: <br /> 1. �31,000 - Tennis Courts <br /> 2. �30,000 - soft ba11 li�hts - center <br /> �;;` 3. 20,000 - new pool stud�r <br /> 4. 10�000 filter replacement - Center Pool <br /> ���� �� 2,500 - bike paths <br /> r;t 6� $44,000 - new tennis courts <br /> 7. � 6,500 - water fountain - Lincoln Street <br /> 8• 1f000 - piano - Senic�r Citizens <br /> Water Fountain - Lincoln Street <br />� This is now being used for Little Lea�ue Games and Soccer <br /> with no water fountain available . It was felt by the <br /> Chairman tha.t this belongs in the DPW budget and will so <br /> be checked with the Selectmen. <br /> P�ol Filter and Studv <br /> � There is a constant loss of water at the present t�_?TIP r t!ls� <br /> both bath houses are against Health �epartment standards. <br /> Mr. Bertini stated that the cost of a new pool. wou].d be <br /> approximately $130,000 - bath house would be `�175,000. The <br /> study would be ju�t at the Center and would look into existing <br /> pool renov�.tion and possible �choal expansion of the swimmin� <br /> pool. <br /> Tennis Courts <br /> Temporary re�airs were done and are not at all satisfaetory. <br /> Gras� is �;rowing through and the general condition is bad. <br /> P1.an would include : <br /> l. reconstruct 3,4,5 & 6 at Center; <br /> resurfacin�� etc � <br /> 2. r.esurface two courts at Valley, <br /> 3. resurface two courts at Adams <br /> Res.- �40,i0�0 <br /> Ran into Hatch Act grobleMs thus the delay. �rust as soon as <br /> weather permits, work will be�in and continue until the money <br /> runs out. New pipeline wi11 run '�7, OOa-w10, 000. It is a sure <br /> thing that more money will be r_eeded . <br /> Soft Ball Zi�hts at the Center <br /> Tt is felt by the Recreation Committee that these should <br /> definitely be made available for those wishin� to play soft ball. <br />
The URL can be used to link to this page
Your browser does not support the video tag.