Laserfiche WebLink
f ) 9 <br /> DATE: January 11, 1982 _ ") "~ <br /> TIME: 7:30 P.M. <br /> rPLACE: Town Office Building, Comptroller's Office <br /> ,.� PRESENT: W. Dailey, E. Arlan, J. Campbell, P. Hall, S. Toye, B. Cataldo. <br /> Conservation Commisdbn members present: D. Williams, J. Frick, F. Smith, J. Oberteuffer, <br /> J. Eddison, N. Barnett. <br /> Commission reported $98,600 left in bond will take care of 2 Articles which they may <br /> bring to Town Meeting. <br /> """5 Possible for next year: See list attached. 3 1 ry- <br /> 1. 150 acres Monroe Meadow - Maple St. , Woburn Street <br /> 2. Tower, Vinebrook <br /> 3. 8 parcels listed on attached sheet worth 11 million (excludes golf <br /> courses) <br /> N. Barnett carrying 1/4 million a year, next 5 years for these purposes. <br /> 1/4 million deleted this year by Town Manager. <br /> B. Dailey feels Town Meeting should consider each of the larger pieces individually. <br /> D. Williams feels he would not come in with request for bond unless a large important <br /> piece "hatches". <br /> Recreation Committee members joined meeting: J. Urig, D. Wells, R. Eby, C. Wilson <br /> and J. Halverson. <br /> Projection on next 5 years attached, with explanations on back (2nd sheet) . Dave <br /> A, Wells feels the $60,000 all-weather track would pay for itself in 8-10 years by <br /> eliminating that much manpower from DPW! 16-20 meets per year. Because we are <br /> the only town in Middlesex League without an all-weather surface, the dirt surface <br /> becomes negligence at some point if someone is hurt. DPW costs $5,000 per year to <br /> maintain according to D. Wells. Town Manager has suggested deletion of this project. <br /> On question from D. Wells, B. Dailey stated there will be no bonding under which to <br /> include this project in "83. <br /> D. Wells stated that the $500,000 in '85 for construction at Lincoln St.-Worthen <br /> Road is "pie in the sky". (Why 15,000 for study, plans and specs?) 80-90% of <br /> expenditure will be for surface. B. Cataldo says study already done calls for <br /> venting of methane gas (already installed) and 15 inches of gravel before final <br /> surfacing, so why another study? Expense for Recreation Committee is level funded <br /> for '83. Athletic Field Lighting was the same area where we had the foundation <br /> difficulty several years ago when it was proposed for $70,000. Recreation Committee <br /> members about split even on fees: <br /> 1. They are fair <br /> 2. Everything should be free <br /> Bob Cataldo questioned need for 120' ladder and Bill Dailey questioned need for <br /> f. compressor. P. Hall 4I - to get answers to these questions for next meeting.t, Respectfully submitted, <br /> Q ---V4 3 : <br /> P. Hall, Acting Secretary <br />