|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2003-02-12-AC-MIN.pdf
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
2000-2009
>
2003
>
2003-02-12-AC-MIN.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 3:30:47 PM
Creation date
3/8/2022 3:30:24 PM
Metadata
Fields
Template:
Archives
Year
2003
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROPRIATION COMMITTEE MEETING <br /> WEDNESDAY, FEBRUARY 12, 2003-7:45 P.M. ROOM 111 <br /> Present: D Brown, S Spector, P Hamburger, R Eurich, A Levine, R Pawliczek, J Ryan <br /> Also Present: P Lapointe, S. Stolz <br /> • P Lapointe gave an overview of the status of the Senior Center Site Committee. <br /> The COA had a board meeting on February 12, 2003 to discuss amongst other <br /> things the concerns expressed over using funds appropriated at the 2000 Annual <br /> Town Meeting. The COA Board feels that it has the ability to spend the $50,000 <br /> appropriated in order to assist them in their analysis of the need. The COA will <br /> provide the community with a more focused and articulate description of any <br /> proposed project. <br /> • P McGonagle addressed the AC on the status of current applications being <br /> submitted to the SBA. Commissioner Driscoll of the Dept. of Education has <br /> imposed a moratorium on any further review or approval of pending school <br /> construction projects. The Harrington and Fiske elementary schools are not <br /> presently on an approved list. The Town permanently issued $14 million of debt <br /> on January 30, 2003 for this project. The School Dept has filed the necessary <br /> documentation, which was due on December 31, 2002 and intends to move <br /> forward and file the remainder of the documentation in June 2003 in accordance <br /> with the DOE guidelines. The AC asked how much has the Town expended to <br /> date for architectural services. <br /> • General discussion of the warrant article, which will propose that the Town <br /> purchase the First Church of Christ Scientist on Forest Street for the purpose of <br /> relocating the school administration building. <br /> • S Spector and K Dooks will review capital articles. <br /> • Write up on MMRVHS was provided by E Michelson and will be discussed at the <br /> next meeting. <br /> • D Brown discussed the meeting she, P Hamburger and J Ryan had with R White. <br /> Discussed the possible ways the Town Manager intends to deal with any loss of <br /> state aid in Fiscal 2004. <br /> • Discussion of the ongoing negotiations with WNA(Wheelabrator,North <br /> Andover). The current NESWC contract will expire September 2005. <br /> Ac.02.12.2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.