|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-12-02-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2021
>
2021-12-02-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2022 9:33:34 AM
Creation date
2/7/2022 9:33:32 AM
Metadata
Fields
Template:
Archives
Year
2021
Department
Town Clerk
Keywords or Subject
Greenways Corridor Committee Meeting Minutes December 2, 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�RECEIVED <br /> 2022 07 If ellj,9 30 aiin <br /> I CLERK <br /> Greenways Corridor Committee UEM �:TO <br /> Accepted Minutes <br /> 2 December 2021 <br /> 4:00 to 5:30 pm via Zoom Conference <br /> Members Present: Mal Crawford, Alex Dohan, Peggy Enders, Eileen Entin, Bob <br /> Hausslein, Bobak Moshiri, Keith Ohmart (chair), Stephen Perkins <br /> Members Absent: Mike Tabaczynski <br /> Other Attendees: Bob Creech (Planning Board liaison) Mark Sandeen (Select <br /> Board liaison), Vinita Verma (Transportation Advisory Committee liaison), Susan <br /> Kenyon <br /> Meeting Minutes of November 4, 2021 approved. <br /> Reports/Updates <br /> All attendees briefly introduced themselves to new GCC member Bobak Moshiri. <br /> The first Thursday of each month was confirmed as the meeting dates for 2022. <br /> No meeting in January. Meeting time is 4:00 — 5:30 pm, subject to possible <br /> change to 4:30 to 6:00. <br /> • 475 Bedford Street. Keith thanked Bob Creech for ensuring that the <br /> developer works with GCC on the trail connection behind the property. <br /> Bob said the developer would be back to the Planning Board with a <br /> succession of more detailed plans. After PB approval, it would be voted <br /> on at Town Meeting in April. Keith said that he and Mike are seeking <br /> discussion with Karen Mullins and have proposed, as a public benefit <br /> condition of approval, that the developer improve the seasonal wet <br /> patches on the trial behind the property, possibly with crushed stone. <br /> • Jefferson Drive Trail Connector. Both the Lexington and Burlington <br /> Conservation Commissions have approved. Mike has scheduled a trail <br /> build for Saturday, December 11 from 9 am to 1 pm, which will include the <br /> construction of a forty foot boardwalk bridge. Volunteers are encouraged. <br /> NEMBA will provide all necessary tools. Assuming permission is granted <br /> to put up trail signs in the Landlocked Forest, GCC can then plan an <br /> ACROSS loop trail which includes Wright Farm, Paint Mine, and Simonds <br /> Brook Forest. <br /> • Pending Website Discussion with Kathy Santos. Keith reported delay <br /> expected for several months because of priority of town website upgrade. <br /> Ongoing Business <br />
The URL can be used to link to this page
Your browser does not support the video tag.