Laserfiche WebLink
�RECEIVED <br /> 2022 07 If ellj,9 30 aiin <br /> I CLERK <br /> Greenways Corridor Committee UEM �:TO <br /> Accepted Minutes <br /> 2 December 2021 <br /> 4:00 to 5:30 pm via Zoom Conference <br /> Members Present: Mal Crawford, Alex Dohan, Peggy Enders, Eileen Entin, Bob <br /> Hausslein, Bobak Moshiri, Keith Ohmart (chair), Stephen Perkins <br /> Members Absent: Mike Tabaczynski <br /> Other Attendees: Bob Creech (Planning Board liaison) Mark Sandeen (Select <br /> Board liaison), Vinita Verma (Transportation Advisory Committee liaison), Susan <br /> Kenyon <br /> Meeting Minutes of November 4, 2021 approved. <br /> Reports/Updates <br /> All attendees briefly introduced themselves to new GCC member Bobak Moshiri. <br /> The first Thursday of each month was confirmed as the meeting dates for 2022. <br /> No meeting in January. Meeting time is 4:00 — 5:30 pm, subject to possible <br /> change to 4:30 to 6:00. <br /> • 475 Bedford Street. Keith thanked Bob Creech for ensuring that the <br /> developer works with GCC on the trail connection behind the property. <br /> Bob said the developer would be back to the Planning Board with a <br /> succession of more detailed plans. After PB approval, it would be voted <br /> on at Town Meeting in April. Keith said that he and Mike are seeking <br /> discussion with Karen Mullins and have proposed, as a public benefit <br /> condition of approval, that the developer improve the seasonal wet <br /> patches on the trial behind the property, possibly with crushed stone. <br /> • Jefferson Drive Trail Connector. Both the Lexington and Burlington <br /> Conservation Commissions have approved. Mike has scheduled a trail <br /> build for Saturday, December 11 from 9 am to 1 pm, which will include the <br /> construction of a forty foot boardwalk bridge. Volunteers are encouraged. <br /> NEMBA will provide all necessary tools. Assuming permission is granted <br /> to put up trail signs in the Landlocked Forest, GCC can then plan an <br /> ACROSS loop trail which includes Wright Farm, Paint Mine, and Simonds <br /> Brook Forest. <br /> • Pending Website Discussion with Kathy Santos. Keith reported delay <br /> expected for several months because of priority of town website upgrade. <br /> Ongoing Business <br />