Laserfiche WebLink
RECEIVED <br /> 2022 28Jain, ui °m <br /> TOWN CLERK <br /> LEXINGTON MA <br /> Committee for an opportunity to address Town Counsel's concerns in an email. The Committee <br /> agreed with Ms. Foley's request to respond to Town Counsel but to send the response to Ms. <br /> Federico first and then she will forward it to Town Counsel. Mr. Pato suggested that Ms. Foley <br /> to apply for Town American Rescue Plan Act (ARPA) funds if Town Counsel does not think the <br /> project is CPA eligible. <br /> The Committee voted by a roll call vote in a straw poll to fund the request to the maximum <br /> extent possible with CPA funds (9-0). <br /> Ms. Foley, Mr. Pollak and Ms. Steele left the meeting at 4:39 PM <br /> FY23 CPA Funding Request- Conservation-Wright Farm Barn Stabilization and Preservation- <br /> Ms. Mullins provided an update on the status of the Wright Farm Barn project since it was first <br /> presented to the Committee. Conservation met with the Facilities Department to secure the <br /> building from trespassers. Ms. Mullins stated that Conservation would like to restructure their <br /> request into a phased plan with the hope to request CPA funding in FY23 for a road map and <br /> CPA funding in FY24 for reconstruction or rehabilitation of the barn. <br /> Ms. Dohan stated that they are hoping to hear back from Colin Smith shortly with an estimate <br /> for phase one of the project which would be a study. Ms. Fenollosa reminded Conservation of <br /> the Committee's 12-29 deadline to submit a warrant article to the Select Board and suggested <br /> putting the project on the warrant with a TBD until Colin Smith can produce a figure. Mr. <br /> Pressman asked about environmental testing. Ms. Mullins stated that pesticide removal was <br /> done when the property was first purchased. Mr. Pressman explained that testing was done on <br /> the material outside of the barn and additional testing should be done for material inside of the <br /> structure. Ms. Dohan stated that she will include the testing in the estimate from Colin Smith. <br /> Mr. Hornig asked if this is something that could be spent out of administrative funds. Ms. <br /> Fenollosa said yes. Mr. Langseth stated that he would also like soil testing done in the interior <br /> as well. Mr. Horton asked what the proposed road map entails. Ms. Dohan stated that it would <br /> be a document detailing the goals of the project and the steps it take to get there. Ms. <br /> Fenollosa asked if the road map would be better for Special Town Meeting because of the time <br /> constraints. Ms. Dohan said if they can get a figure from Colin Smith next week, Annual Town <br /> Meeting is preferred. Mr. Hornig asked approximately how much the road map would cost. Ms. <br /> Dohan stated possibly$20,000. <br /> The Committee voted by a roll call vote in a straw poll to approve the project as a place holder <br /> with an amount to be determined in the hopes that Colin Smith will provide a figure for the <br /> plan and environmental testing in the time needed for Annual Town Meeting (8-0-1) Mr. Hornig <br /> was a "wait". <br /> 2 <br />