Laserfiche WebLink
10/20/2021 AC Minutes <br /> a request to use a previous appropriation for the installation of a new prefab bathhouse at the Old <br /> Res rather than renovating the existing bathhouse. No additional funds are needed. <br /> Mr. Parker reviewed the status of this Committee's report, asking that missing material be <br /> submitted before next week's meeting. Ms. Kosnoff reported that the motions for the articles should <br /> be available in a day or two. She commented on other material that she will provide for various <br /> articles, hopefully by Friday, as follows: <br /> • Article 4: Amend FY2021 Operating and Enterprise Budgets: Operating adjustments to the <br /> general fund and the water/sewer fund are expected, including the following: <br /> ➢ A new management analyst position, for which a job description and rationale are <br /> being prepared, may be funded using ARPA funds because ARPA requires <br /> considerable documentation and management oversight. <br /> ➢ Water/sewer salary line items will be reduced to correct a previous error. <br /> ➢ Adjustments to the police department are expected. <br /> ➢ Shifting a management analyst position in the IT Department to the library Personal <br /> Services line item is anticipated because of the IT needs at the library. <br /> ➢ Increased funding for Fire Department overtime is needed after several years of <br /> being level-funded. <br /> • Article 3: Establish, Dissolve and Appropriate To and From Specified Stabilization Funds: <br /> Recommended amounts to go into the Capital Stabilization Fund (CSF) and the <br /> Transportation Demand Management Stabilization Fund are being finalized. The Town's <br /> new growth, which ultimately needs to be certified by the State Department of Revenue, is <br /> currently estimated to be approximately $2.15 million greater than projections used for the <br /> FY2022 budget. It may be recommended that a small portion of that additional amount be <br /> used to support some of the operating budget adjustments with the balance going into the <br /> CSF. <br /> • Article 5: Appropriate for Police Station Architectural Design and Swing Space <br /> Construction and Article 7 Appropriate for Westview Cemetery Building Construction: An <br /> alternative to tranferring the additional new growth funds into the Capital Stabilization <br /> Fund, would be to use some portion as cash capital to help fund these two articles. <br /> Additional information provided during the discussion, included: <br /> ➢ Funds that are borrowed for the new police station will be included in a debt <br /> exclusion package, but it might be advisable to use cash capital for renovating the <br /> swing space for this project. <br /> ➢ Westview Cemetery generates revenue from burial fees, which are currently going <br /> into the general fund and the sale of plots. Although these are used to help cover <br /> operating costs, it is also expected that the Town will help cover some of the costs. <br /> Current thinking is that some of the new growth funds could be used to offset some <br /> of the costs of the new building. <br /> ➢ Although interest rates are currently low, they are not expected to remain so. <br /> ➢ Some of the previously incurred debt will be paid off before new debt service is <br /> added for the police station, so that the portions of tax bills from exempt debt service <br /> will not increase due to that project. <br /> Votes on articles were taken as follows: <br /> • Mr. Michelson added his support for recommending approval of Article 5: Appropriate for <br /> Police Station Architectural Design and Swing Space Construction and Article 7: <br /> Appropriate for Westview Cemetery Building Construction, making the vote 8-0 for both. <br /> 2 <br />