Laserfiche WebLink
Greenways Corridor Committee <br /> Meeting Minutes <br /> August 26 2021 <br /> 3:30 — 5:30 pm via Zoom Conference <br /> Members Present: Mal Crawford, Alex Dohan, Eileen Entin, Peggy Enders, Bob <br /> Hausslein, Susan Kenyon, Keith Ohmart, Stephen Perkins, Mike Tabaczynski <br /> Other Attendees: Bob Creech (Planning Board Liaison), Christian Boutwell (Interim Rec <br /> Committee Liaison), Mark Sandeen (Select Board Liaison), <br /> Votes: Meeting minutes of 3 June 2021: Approved <br /> Reports/Updates: <br /> • The GCC will lose its two nonresident committee members (Susan and Mike) in the <br /> upcoming year because the Select Board is reluctant to reappoint nonresidents to <br /> town committees. To fill their positions, Keith indicated he has a list of potential <br /> candidates for the committee whom he will interview. We are exploring with the <br /> Select Board ways in which our nonresident members can be appointed as nonvoting <br /> honorary members. <br /> • In connection with the discussion about committee membership, Keith suggested that, <br /> as a group, the committee look at, create, and archive a list of our goals and <br /> objectives for the future. As a start, Keith will send around a spreadsheet and map of <br /> proposed trail options, which committee members can review. Members can send to <br /> Keith other items and objectives for the list. What is eventually put together can be <br /> put into the open space and rec plan. <br /> • The committee welcomed Christian Boutwell, who will serve as interim Rec <br /> Committee liaison. Christian said that as a rec committee member he is interested in <br /> opportunities for recreation in green space and way in which the rec committee can <br /> support outdoor recreation activities for Lexington residents. <br /> • The committee agreed to hold its October meeting by Zoom. Peggy took a screen <br /> shot of all the members on Zoom to serve as the annual photo. <br /> • Regarding the Jefferson Drive Trail Connector, the North Shore development <br /> engineer is updating the paperwork for the Burlington and Lexington Conservation <br /> Committee meetings. The meeting in Burlington is set for Sept. 9, with a default of the <br /> Oct 14 meeting if this topic isn't covered in September. Mike felt this would be <br /> adequate timing to gather volunteers for Oct 16 and 23. We will need to touch base <br /> with the Lexington Conservation Commission regarding trail development and the <br /> Burlington Conservation Commission for permission to put up signs. It is also <br /> expected that the Burlington Conservation Commission will require that we go before <br /> the Burlington Select Board. <br /> • On the Wayfinding Sign Project, Stephen and Bob installed 12 posts for the signs. <br /> The DPW will install 2 metal posts as requested by the Historical Commission. Mike <br /> submitted one sign to the vendor, who said he will charge about $75/sign. Mike will <br /> send all the signs to the committee members for a final accuracy check and then send <br /> them to the printer. <br />