Laserfiche WebLink
<br />Greenways Corridor Committee <br />September 28, 2015 <br />Room 125, Hadley DPW Building <br />Lexington, Massachusetts <br />Members Present: Alex Dohan, Peggy Enders, Eileen Entin, Don Grant, Bob <br />Hausslein, Keith Ohmart, Mike Tabaczynski, <br />Other Attendees: Susan Kenyon <br />Votes <br />: Minutes approved: 8/31/2015 <br />Reports/Updates <br />: <br />• Susan Kenyon is considering the invitation to join the GCC. <br />• The GCC will sponsor the application to the Conservation Commission for a bench <br />in Rick Abrams’memory to be placed in Dunback Meadow. The GCC sponsorship <br />saves the application fee to the Town since the GCC is a Town committee. <br />• The MAPC visit is scheduled for 8:45am in the Selectmen’s Meeting Room on Oc- <br />tober 8. There will be a half hour or so of presentation, including a short presenta- <br />tion of the development of the ACROSS concept and routes by Keith, followed by <br />a walk on a segment of Route A, through lLowervVine bBrook, Chiesa Farm and <br />Parker Meadow. <br />• Conflict of Interest meeting - Peggy was unable to attend. (You probably got an <br />email with the paperwork, and must, as a committee member, complete an online <br />course every two years.) <br />• Brochure distribution - we have about 1000 left, which means we’ve distributed <br />11,000 brochures in the past year. It cost us about $1,700.00 to print the 12,000. It <br />would only be a small dollar amount more to order 15,000 next time. It probably <br />does not make sense to order more now. We should wait until the new routes are <br />marked. We discussed creating a QR code to be made into stickers to place on <br />the brochure holders so people could access the online maps with a smartphone. <br />Bob will look into QR code stickers. We will leave the lucite brochure boxes up for <br />the winter even though they are empty. We need to think about how often to up- <br />date the printed brochure. The website can be updated easily as necessary. Park- <br />ing areas should be marked on the maps. <br />• The website revision is happening, but there are lots of steps. <br />• There is a residential development going in on Lincoln Street near the Cambridge <br />Reservoir. This could be a good opportunity for developing trails and a parking <br />area. <br />• Shire Trail - there will be more information available by the October meeting. <br />Ongoing Business <br />: <br />• Route E/F work is ongoing, communicating with Conservation and Recreation as <br />necessary, Peggy has been talking with Karen Mullins and Karen Simmons, re- <br />spectively. The Martingale Rd/Freemont St intersection needs a post where the <br />trail goes in at 2 Martingale. Dig Save should be called for post installation. About <br />a dozen posts will be needed between Meagherville and Poor Farm. Also, leaves <br /> <br />