Laserfiche WebLink
<br />PLANNING BOARD MINUTES <br />MEETING OF FEBRUARY 11, 2015 <br /> <br />A regular meeting of the Lexington Planning Board, held in the Selectmen’s Meeting Room, was <br />called to order at 7:01 p.m. by Chairman Charles Hornig, with members Nancy Corcoran- <br />Ronchetti, Richard Canale, Timothy Dunn, Ginna Johnson and planning staff Maryann McCall- <br />Taylor, Aaron Henry and Lori Kaufman present. <br />*************************DEVELOPMENT ADMINISTRATION******************** <br />PUBLIC HEARING <br />3 Martingale Road, special permit modification: <br />Mr. Hornig called the public hearing to order at 7:05 p.m. There were no people in the audience. <br />Mr. Waitt represented the applicant Peter Chiarelli, to request a modification of the special permit <br />to allow the addition of a pool, a pervious pavement patio and a bath house. Mr. Waitt said the <br />request was to increase the impervious area limit for Lot 1 of the subdivision from the approved <br />17.9% to 20.0% for Lot 1. Since the last plan the pool was moved 8.5 feet west and the pool <br />house moved 20 feet to the west. The Conservation Commission approved the plan and there <br />were no abutter objections. <br />Board Comments: <br /> <br /> The applicant should move the pool to the north to not block the light and within the <br />original limit of work line (LOW). Plantings should go up to the limit of paving. <br /> <br /> There was disappointment that the applicant did not reach out to abutters. <br /> <br />On a motion duly made and seconded, it was voted, 5-0, to close the public hearing at 7:20 p.m. <br /> <br />On a motion duly made and seconded, it was voted, 5-0, to approve the modification to the <br />special permit with site plan review to increase the impervious surface from 17.9% to a maximum <br />of 20% and a condition to relocate the pool house north of the pool and west of the original LOW. <br />36, 42, & 48 Cary Avenue, Definitive Subdivision: <br />Mr. Hornig called the continued public hearing to order at 7:22 p.m. There were 2 people in the <br />audience. Mr. Waitt, Engineer of Meridian Associates, John Farrington, Attorney and Todd <br />Cataldo, the applicant were present. Mr. Waitt said the following changes were made: a note was <br />added to the site analysis plan that there were no wetlands located on the property, the drainage <br />structure to Lot C was relocated and a drainage easement added, the stonewall on Lot A would <br />now run parallel to the property line, trees were added on opposite side of the ROW, the sidewalk <br /> <br />