Laserfiche WebLink
<br /> TOWN OF LEXINGTON, MASSACHUSETTS <br />CONSERVATION COMMISSION <br />MINUTES <br />Thursday, September 4, 2014 <br />6:30 P.M. <br />Training Room, Department of Public Works <br />201 Bedford Street <br /> <br /> <br />Chair Joyce Miller opened the meeting at 6:37 pm in the Parker Room of the Town Offices <br />Building. <br /> <br />Commissioners Present: Joyce Miller, Duke Bitsko, Phil Hamilton, Dick Wolk and Alexandra <br />Dohan <br /> <br />Commissioners Absent: David Langseth <br /> <br />Others Present: Michelle Morelli, Community Development Department Assistant <br /> <br />PENDING MATTERS <br /> <br />6:37 pm Ms. Miller introduced Alexandra Dohan to the Conservation Commission as a <br />new member. <br /> <br />Route 2 over Interstate 95 Bridge Replacement – Vegetation Management Plan, <br />Control Treatment – Phase I <br /> Tara Mitchell, MassDOT, Mark Fideli, Bob Coons, General Contractor, and <br />David Kaplan, Cambridge Water Department were all present for this discussion. <br />Mr. Bitsko asked if a schedule of work was determined. Ms. Mitchell proposed <br />invasive species removal and provided maps as well as photographs with <br />descriptions for the Commission to review. Ms. Mitchell explained that the <br />treatments will take place over a two year period. Mr. Bitsko asked about long- <br />term monitoring and maintenance. Ms. Mitchell described the photographs and <br />individual treatments for each specific area. Instead of spraying, Mr. Bitsko <br />suggested the use of a dye and swab technique for removing the phragmites. Mr. <br />Kaplan stated that the Cambridge Water Department was given this information <br />only a few days before. He asked the Commission if they had any concerns <br />regarding the use of sprays and suggested the Cambridge Water Department go <br />over appropriate treatments for certain areas to minimize the potential of seepage <br />into the plant. MassDOT and Mr. Kaplan will meet and come back to the <br />Commission with a definitive plan. <br /> <br />7:22 pm Plan change approval: 25 Suzanne Road, DEP# 201-918, BL 878 <br /> Tim Lee, Landscape Architect and Jeremy Kieval, Homeowner were both present <br />for this proposal. Mr. Lee proposed the plan changes at 25 Suzanne Road which <br />include; removal of two trees within the 100’ buffer zone, addition of a gravel car <br />pull-off (+150 sq. ft.), relocation of the existing front walk (+68 sq. ft.), addition <br />of paved porch landings (+60 sq. ft.), addition of a stepping stone path (+216 sq. <br />ft.), addition of landscape steps (+30 sq. ft.), addition of a patio and fireplace <br />(+550 sq. ft.), and additional plantings outside the 25’ buffer zone. The <br />Commission voiced concerns with the location of the patio and fireplace within <br /> <br />