|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-01-20-HC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Historical Commission-HC
>
Minutes
>
2021
>
2021-01-20-HC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 11:05:33 AM
Creation date
6/10/2021 11:05:28 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - HC - Historical Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HISTORICAL COMMISSION MEETING MINUTES <br /> January 201h 2021 <br /> Call to Order: A public hearing of the Historical Commission was held remotely through <br /> Zoom. The meeting convened at 7:02PM <br /> Historical Commission Members in Attendance: <br /> Marilyn Fenollosa, Chair, David Kelland, Wendall Kalsow, Diane Pursley, Susan Bennett and <br /> Robert Rotberg <br /> AGENDA ITEM #1 (7:07 PM) <br /> Public hearing regarding the roofline change at 456 Concord Avenue <br /> APPLICANT (S) PRESENT: <br /> Neil Williams, Contractor <br /> Rina Okawa, Architect <br /> ABUTTER(S) PRESENT: <br /> None <br /> DOCUMENT(S): <br /> Proposed plans dated 1/20/2021 <br /> SUMMARY: <br /> Mr. Williams went over proposed plans for 456 Concord Avenue. The homeowners would like <br /> to add a second floor addition above the family room. The homeowners decided to scale back <br /> the project due to wetlands in the area. Mr. Williams is now proposing to make the family room <br /> floor level with the rest of the house by bringing up the roofline to match the existing ceiling <br /> height inside the kitchen. <br /> HC COMMENTS: <br /> The Commission expressed concerns over the height of the roofline and wanted clarification <br /> regarding the proposed work. The Commission recommended Mr. Williams come back next <br /> month with additional information including existing and proposed elevations. <br /> PUBLIC COMMENTS: <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.